Omron NX-PA Series User Manual page 105

Machine automation controller
Table of Contents

Advertisement

1
Install the DIN Track.
• Using a PFP-50N/100N DIN Track
Use one M4 screw for each three holes in the DIN Track. There must be a screw for each inter-
val of 105 mm or less. The screw tightening torque is 1.2 N·m.
Use one screw for each three holes.
• Using an NS 35/ 7,5 PERF or NS 35/ 15 PERF DIN Track
Use one M6 screw for each four holes in the DIN Track. There must be a screw for each interval
of 100 mm or less. The screw tightening torque is 5.2 N·m.
Use one screw for each four holes.
2
Connect the Power Supply Unit and the CPU Unit and lock them with the sliders.
(1) Join the Units so that the connectors fit exactly.
(2) The yellow sliders one each at the top and bottom of each Unit lock the Units together.
Move the sliders toward the back of the Units as shown below until they click into place.
NX-series CPU Unit Hardware User's Manual (W535)
DIN Track
DIN Track
(2)
(1)
4 Installation and Wiring
4
4 - 17

Advertisement

Table of Contents
loading

Table of Contents