4. SETTING AND PROCEDURE BEFORE OPERATION
4.
SETTING AND PROCEDURE BEFORE
OPERATION
4.1
Procedure before Operation
Downloaded from
ManualsNet.com
The procedure before operation of AJ65BT-68TD, part identification and setting, and the wiring
method are explained below.
The procedure before operation of AJ65BT-68TD is explained below.
Start
Connect the supplied Pt100 temperature-measuring
resistor to the RTD terminal on the terminal block.
Set the switches listed below on AJ65BT-68TD.
• Station number setting switch
• Transmission baud rate setting switch
Install the AJ65BT-68TD.
Connect cables to the AJ65BT-68TD.
Programming
End
search engine
························· Refer to Section 4.3
························· Refer to Section 4.2, 4.6
························· Refer to Section 4.7
························· Refer to Chapter 5