Brinkmann–Vertical End Suction Pumps Series SBA1600...2000-V, SBG1400...1700-V and SBF1350...1850-V Contents 9 Trouble shooter’s guide ........6 Indication to the manual ........2 Description of product ........2-3 10 Spare part ............7-8 Safety instructions .......... 3-4 11 Repair Instructions ........8-9 Transport and storage ........
Safety instructions relevant for operation 5 Installation and Connection • If hot or cold machine components involve Mechanical installation hazards, they must be guarded against acci- The pumps must be properly fastened. The pipework dental contact. must be installed so that no distortion of the pump can •...
Electric wiring 6 Start up / Shut down Start up ATTENTION Switch off at the mains. All service work must be carried out by quali- After connection the electrical wires, close the fied service personnel. Pump must be discon- terminal box. Briefly start the motor (max. 30 sec.) nected from the power source and all rotating and check the rotation according to the arrow on parts must stand still.
8 Servicing and Maintenance Pumps with double mechanical seal Pumps with double mechanical seal must include ATTENTION an oil receiver with a capacity of 1.1 litres. Check this through the inspection window. The surface of the motor must be kept free of dirt. Oil receiver Castrol WHITEMOR WOM14 or The motor shaft is spinning in permanently greased equivalent oil.
10 Spare part SBA1600...2000-V, SBG1400...1700-V and 10.1 Spare part list for Brinkmann Vertical End- SBF1350...1850-V Suction Pumps Series Item Description Stator with terminal board Motor flange End shield Terminal box 5.5 kW Terminal box cover up 7.5 kW 4.1 Terminal box frame up 7.5 kW Retaining ring 5.5 kW...
(50) and seal insert (20). Slide the rotating axial face seal unit (24b-24e) onto quick shaft 1. Pumptype (91) and fix in position using shim ring (22) and e.g. SBA1600-V circlip (25). 2. Pump No. e.g. 12198220-V 10)The remaining assembly steps are Pos 2) to 8) The date of the construction year is a compo- in reverse order.
11.2 Dismantling the insert shaft 12) Mount the seal insert and the pump body. The remainder of the reassembly process is to be completed in the opposite order of the prior de- scribed dismantling process. ATTENTION Note torques for the screw connections! 1 = Shaft clamp 2 = Insert shaft 13) Position the pump laterally and fill the pump...
Produktbezeichnung / Product name / Désignation du produit / Designación del producto Vertikale Blockpumpen / Vertical End-Suction Pumps / Pompes verticales monobloc / Bombas verticales mono- bloc SBA1600…2000-V, SBG1400…1700-V, SBF1350…1850-V Typ / Type / Tipo Das bezeichnete Produkt stimmt mit den folgenden Richtlinien des Rates zur Angleichung der Rechtsvorschriften der EG-Mitgliedsstaaten überein:...
Need help?
Do you have a question about the SBA1600 and is the answer not in the manual?
Questions and answers