Before powering up the enclosure please ensure that all the modules are firmly seated in their
correct bays.

3.2 Power On

Caution
Do not operate the subsystem until the ambient temperature is within the specified operating
range. If the drives have been recently installed ensure they have had time to acclimatize before
operating them.
Note
Please refer to Section
1
Apply AC power to the enclosure. Turn the Power Supply modules to ON.
2
On the Ops Panel, the Audible Alarm beeps once, all LEDs flash for 7 seconds then the Alarm double
beeps.
3
All LEDs on the Ops Panel should be lit (Green) when the enclosure power is activated (and the disk
drive motors should start).
Note
All LEDs on the Ops Panel should be lit Green at power up to indicate that the system is functioning
correctly. If any show Amber then a problem exists and please contact certificated supplier.
Important
If AC power is lost for any reason, on restoration of power the enclosure will re-start automatically.

3.2.1 Power Supply/Cooling Module LEDs

The Power Supply/Cooling module incorporates 4 LEDs, located below the On/Off switch and shown
in
Table
3–1.
• Under Normal conditions the LEDs should all be illuminated constant GREEN
• If a problem is detected the color of the relevant LED will change to AMBER.
3.3
for details of the Ops Panel LEDs and related fault conditions.
Follow the procedure below to Power On the enclosure.