Mark the mounting holes.
In the case of the Cheetah install,
material will need to be removed from
the engine rails as marked. See
photos on following pages.
Use a Dremel wheel to remove the
material marked with Blue Masking
Tape. The dimension shown is 3.25".
A vertical cut of .375" will be made to
clear the plywood mounting rails.
Test fit the lower bypass to the pipe
and engine mounting rails.
BVM ®2021
24
10/8/2021
Need help?
Do you have a question about the GO FLY GOLD BVM PNP F-16 C and is the answer not in the manual?
Questions and answers