VZR.230200.000 IG CONTENTS GENERAL INSTRUCTIONS ......................4 SAFETY REQUIREMENTS ......................5 Preparations for item’s installation....................6 3.1 Transportation of item to the installation place ................ 6 3.2 Unpackaging regulations ......................6 3.1 Item’s inspection regulations ....................6 3.3 Requirements for the installation site ..................7 3.2 Procedure for checking the conformity of the installation site ..........
Page 3
VZR.230200.000 IG This installation guidelines (IG) is composed for Turnstile Oxgard Praktika QL-04 и and its modifications (hereinafter referred to as - item). Firmware version: FW v2.4-2.5 software turnstile version with swing doors 660 mm – FW v2.4; software turnstile version with swing doors 900 mm – FW v2.5.
VZR.230200.000 IG GENERAL INSTRUCTIONS When assembling and installing the product for general safety take into account all the recommendations and instructions given in this manual. Before starting the installation work, completely disconnect the power supply of the item. IT IS PROHIBITED: TO INSTALL POWER SUPPLY MODULE INSIDE THE BODY OF THE TURNSTILE AS IT MAY RESULT IN AN INJURY OF THE HUMAN BEINGS DUE TO AN ELECTRIC SHOCK.
VZR.230200.000 IG SAFETY REQUIREMENTS Installation should be carried out in compliance with the "Rules for the technical operation of electrical installations of consumers" and "Safety regulations for the operation of electrical installations of consumers". The installation of the product should be carried out by qualified personnel prepared for work with electrical appliances, instructed about safety precautions when working with electrical installations with voltages up to 1000 V.
VZR.230200.000 IG PREPARATIONS FOR ITEM’S INSTALLATION Transportation of item to the installation place Turnstile in its original packaging shall be transported by air, by road and by railroad with protection from direct exposure to rain and dust without range limitation. After transportation at a negative temperature, in order to avoid condensation of moisture, the item should be kept in a room with normal climatic conditions during 12 hours.
VZR.230200.000 IG 3.1.1 Perform an external inspection of the packaging. Box should not have visible damage. 3.1.2 In case of damage, make a reclamation act. 0 overall turnstile’s dimensions 3.1.3 Picture 1 Overall turnstile’s dimensions Requirements for the installation site ATTENTION: INSTALL THE TURNSTILE RELIABLY IN ORDER TO AVOID SWINGING AND / OR TURNOVER IN THE PROCESS OF OPERATION.
VZR.230200.000 IG Procedure for checking the conformity of the installation site ATTENTION: DURING INSTALLATION TAKE INTO ACCOUNT THAT GLASS WINGS CANNOT BE ADJUSTED. IT IS RECOMMENDED TO CHECK THE CORRECTNESS OF INSTALLATION BEFORE FIXING THE SIDE UNITS. ATTENTION: DURING PREPARATION OF THE INSTALLATION SITE TAKE INTO ACCOUNT THAT EACH SIDE UNIT REQUIRES A SEPARATE POWER SUPPLY.
VZR.230200.000 IG ITEMS´S INSTALLATION AND DISMANTLING Required equipment Equipment used in the process of installation of the turnstile: electric drill; hard alloy drill 16 mm in diameter for drilling holes for anchors in the floor (recommended anchor shell SORMAT PFG ES 10); wrench for screws DIN 933 М10х60 S17;...
Page 10
VZR.230200.000 IG 4.1.3 Installation site of the turnstile: 0 according to installation dimensions prepare 8 holes 16 mm in diameter in the floor for fixation anchors of the two of the turnstile´s stands. Location of the mounting holes in relation to the outer dimensions of the turnstile is shown in Appendix B.
Page 11
VZR.230200.000 IG 4.1.5 Lay to the wiring duct or trench the connecting cable for remote control panel, cable for PS, bus – CAN cable, RS-485 indication bus cable and, if provided, ACS and SFAS cables. 4.1.6 Mount turnstile stands on the prepared installation site. 0 undo 4 screws М4 (2) and remove base cover (1).
VZR.230200.000 IG 4.1.8 Align together the holes in the lower plate of side unit and anchors in the floor. Check the vertical installation in 2 planes. If necessary, use appropriate steel underlayers for proper installation of the speedgate. Fix the housing of side unit with 8 screws M10, tightening them to the corresponding anchors by using a wrench with internal hexagon S17.
VZR.230200.000 IG ITEMS CONNECTION AND SETTING-UP Connection of RC, PS and ACS is performed with the use of crossboard. Picture 4 - the location of the boards at the stand of the speedgate unit. Picture 1 – Arrangement of boards at speed gate stand 1 –...
Page 14
VZR.230200.000 IG 0 depicts the cross-board and connectors for PS, RC, ACS and FA. Picture 5 – General view of the cross-board Table 1 describes different speed gate operation modes with different positions of jumpers. Table 1 – Speed gate operating modes The position of jumpers Operating mode of speedgate J1 removed...
VZR.230200.000 IG Connecting power supply IT IS PROHIBITED: DO NOT USE POWER SUPPLIES WITH AN OUTPUT CURRENT LESS THAN 10 A. DO NOT CONNECT THE POWER CABLE WITH CROSS- SECTION LESS THAN 1.5 ММ . WHEN THE LENGTH OF THE POWER CABLE IS MORE THAN 5 M - IT IS RECOMMENDED TO USE A CABLE WITH 2.5 MM CROSS-SECTION.
VZR.230200.000 IG Connecting control panel RC panel is connected to Control Board contact set on cross-board. Marking of contacts: 12V, CL, CH, GND. Connection of RCP shall be made on the basis of contacts’ marking, provided in Table 2. Table 2 - Contact marking for RCP connection Contacts marking Wire color Yellow...
Page 17
VZR.230200.000 IG AP input possesses the highest priority. At GND contact of this input the turnstile works with open wings (glass doors) and DOES NOT REACT (!) to the other signals except for STOP mode possesses the medium priority. AT GND contact of this input the turnstile in stop mode “Stop! and does not react to the other signals except for AP signal;...
VZR.230200.000 IG Cross-board contains two relay outputs for ACS operating on the principle of "dry contacts» - Pass Okl and Pass Ok2. NO and COMM - normally open connection, NC and COMM - normally closed connection. Activation of one of the contact sets suggests the passage in the corresponding direction (PassOk1 - right or left, PassOk2 - left or right).
Page 19
VZR.230200.000 IG To use this turnstile connection scheme it is required to install a jumper of chosen passage to the both cross-boards (Ошибка! Источник ссылки не найден. J2). With J2 jumper installed the turnstile does not react to the signals coming from the control panel but transmits their state to the contacts of the terminals (0 I/O1...I/O4), which are the outputs with bare collector.
Page 20
VZR.230200.000 IG Table 4 - Assignment of I/O contact group Маркировка контактов Назначение контактов Status of “Left” button (1) I/O1 Status of “Right” button (3) I/O2 Status of “Stop” button (2) I/O3 Status of “Antipanic” button (4) I/O4 I/O1 ... I/O3 outputs show the current status of the RC panel buttons, i.e. transistor is opened by pressing the corresponding button.
Page 21
VZR.230200.000 IG 0 connection scheme of PCP to ACS controller. In this case the controller controls the speedgate via "LEFT", "RIGHT" and "STOP" contacts, and the "AP" contact is turned on and off with the RC panel. Please note that when the RC panel is connected via ACS controller it is impossible to use speedgate modes which are set by the combination of the RC panel buttons (except for the free passage in the potential control mode.
VZR.230200.000 IG Connecting side units 0 connection scheme for two side units. In case you need to increase the number of passes, it shall be cascaded Picture 9 - connection scheme for turnstile units Turnstile Praktika QL-04 Installation guidelines...
Page 24
VZR.230200.000 IG Control panels RC1 and RC2 are connected to pins «+ U» «CL» «CH» «GND» of corresponded unit. If RC panels are connected as shown on Picture 9 jumpers shall be set as follows for the proper operation of the bus CAN2.0 J4: -J4 on the motherboard 1 is open, J4 on the motherboard 4 is closed -J4 on the motherboard 3 is open, J4 on the motherboard 6 is closed Picture 10 - for synchronous operation of LED indication stripe of neighbor...
Page 25
VZR.230200.000 IG Picture 10 - Connection scheme for turnstile terminals Первая CAN шина – First CAN busline Вторая CAN шина –Second CAN busline ВХОД – ENTRANCE ВЫХОД - EXIT Соединить клемные колодки модулей A и B – Connect terminals A and Соединить...
VZR.230200.000 IG Detailed connection pattern of two units of speedgate is shown in Appendix In order to provide the entrance with two passages you need four power supply units 12V 5 A. The middle unit is powered either by two power supply units 12V 5A or by single power supply 12V 10A.
Page 27
VZR.230200.000 IG Picture 11 – Possible variants of card collector’s location ВХОД – ENTRANCE ВЫХОД - EXIT ATTENTION: CAR COLLECTOR DELIVERY SET INCLUDES CONTACTLSS CARDS READER OF TWO TYPES: EITHER PROX13 OR PROX125. WEB-SITE OF MANUFACTURER’S READERS: WWW.PROX.RU Customer choices the right reader that will match the control system parameters indicated when making the order.
Page 28
VZR.230200.000 IG Picture 12 – General view of card collector stand 1 – card hole, 2 – indication stripe, 3-lock, 4-storage device Connection of PS, AD and ACS is performed via card collector board. To do this, remove base turnstile panel. general view of card collector’s board and arrangement of –...
Page 29
VZR.230200.000 IG Picture 13 - General view of card collector board 5.3.1 Connecting power supply Card collector is powered by a 12 V DC voltage source. Maximum consumption is present in the mode of card collection - 1.5A. Connect (+) and (-) contacts of power supply to (+ 12V) and (GND) contacts on the board respectively.
Page 30
VZR.230200.000 IG NC, NO, and COMM contacts. Relay output operating on a "dry contact" principle, which closes / opens, transmitting passage authorizing signal to AD. NC and COMM - normally closed connection, NO and COMM-normally open connection. "Pass Ok-GND" contact set Pass Ok and GND contacts.
Page 31
VZR.230200.000 IG 5.3.3 Connecting ACS controller Structural diagrams of the ACS controller using a card collector are given in Appendix D. ATTENTION: ACS CONTROLLER IS CONNECTED TO ONE SPEEDGATE UNIT ONLY. CONNECTION BETWEEN UNITS IS PROVIDED BY CAN-BUS 0 connection of ACS controller to the card collector provided by three contact sets: Take Card-GND, Free Pass-GND and Card Inside.
Page 32
VZR.230200.000 IG If card collection is confirmed by internal sensors, card collector generates a signal to the AD via Let Go contact set and to ACS via "Card Inside" contact set. In such case a green arrow indicator on the LED panel turns on. Free Pass-GND"...
Page 33
VZR.230200.000 IG In order to switch into pulse mode: Turn off the power Press and hold BUT1 button until the card collector provides 1 audio signal, indicating that it is switched to pulse mode of operation; Set mode is saved when power is turned off. Card Inside contact set (signal for card collection confirmation).
VZR.230200.000 IG COMPLEX TEST Inspection and verification of the product’s readiness for usage Check turnstile’s units 6.1.1 6.1.2 Check the reliability of all the cables. Switch on the PS and check turnstile’s functioning by making 6.1.3 some tests. 6.1.4 In case of absence of abnormal noise and any violation of the operating modes, the turnstile is ready for operation.
VZR.230200.000 IG COMMISSIONING OF INSTALLED ITEM Commissioning of installed item is organized in the following way: 1) the representative of the organization who made the installation, demonstrates reliability of the installation of the item; .230200.000 DS 2) notes about the installation of the item are made in Datasheet VZR DS in the section "Item’s Movement during Operation";...
VZR.230200.000 IG APPENDIX А — Brief Description of Data Bus CAN2.0 Remote control panel uses a modern jam-resistant bus of standard CAN2.0. According to the standard CAN2.0 a length of signal cable can reach the values more than one kilometer, however correct operation at such distances depends on many factors.
Page 37
VZR.230200.000 IG Picture 14 – PS connection to turnstile units Turnstile Praktika QL-04 Installation guidelines...
VZR.230200.000 IG APPENDIX B — Power supply units and controllers Usage of recommended power supplies and tested controllers guarantees the uninterrupted operation of the product. Recommended power supplies: – MEAN WELL DR-120-12; – MEAN WELL EDR-120-12. Tested controllers: – ERA-2000 (ERA--10000). Turnstile Praktika QL-04 Installation guidelines...
VZR.230200.000 IG APPENDIX D — Block diagram of ACS using the card collector Picture 16 – Block diagram №1 0 shows the most common connection circuit of card collector. OD can be controlled either by ACS controller or by the card collector directly, that is why connections 1* and 2* are drawn by dotted lines.
Page 41
VZR.230200.000 IG Picture 17 – Block diagram №2 Picture 17 shows a more advanced but also a more high-cost circuit connection. The advantage of this scheme is that it uses only one reader installed in the card collector. Wiegand interface provides a possibility to connect several identical ACS controllers to one reader in parallel.
Page 42
VZR.230200.000 IG Picture 18 – Block diagram №3 The block diagram №3 (Picture 18) can be considered to be a logical development of the block diagram №2. It reduces the cost of installed system. For this purpose the controller with two output signals to one input of a reader (i.e., the controller can distinguish the guest cards and permanent cards transmitting a signal to the corresponding output) is used.
VZR.230200.000 IG APPENDIX E — BLOCK DIAGRAM OF MINIMAL CONNECTIONS FOR SYNCHRONIZED OPERATION OF WINGS WITH THE USE OF ONE RC PANEL Turnstile Praktika QL-04 Installation guidelines...
Page 44
VZR.230200.000 IG Колодка синхронизации индикации 1 - Synchronization shoe 1 Колодка синхронизации 2 - Synchronization shoe 2 Picture 19 Block diagram of minimal connections for synchronized operation of wings with the use of one RC panel In order to secure stable operation of the speedgate unit one GND terminal of one unit shall be connected to another GND terminal of another speedgate unit.
VZR.230200.000 IG APPENDIX F — EXAMPLE OF INSTALLING SEVERAL UNITS Picture 2 - Entrance example (top view). 0 several speedgates set a required pass zone when mounted in a row. In this case side and middle units should be used. ATTENTION: ANY OF THE UNITS CANNOT BE USED STAND-ALONE.
VZR.230200.000 IG APPENDIX G — Designation of reader terminals PROX Table 1- Designation of reader terminals PROX-125 Name Designation Cable color SYNC Synchronization of readers Yellow Data «0» or emulation «touch memory» D0/TM Green Data «1» White Turning on the sound signal Turning on the green diode Orange Turning on the red diode...