Hardware Installation; Wall Mount Installation - Planet WGS-5225-8MT Quick Installation Manual

Industrial l2+ 8-port 10/100/1000t m12 wall-mount managed switch
Table of Contents

Advertisement

5. Hardware Installation

5.1 Wall Mount Installation

To install the Wall-mount Managed Switch on the wall, simply follow the following
steps:
Step 1: It is required 4 holes with 8mm diameter on the wall; the distance
between the 2 holes is 230 mm and the line through them must be
horizontal.
Ø4mm
Ø8mm
Step 2: Install a conductor pipe inside the board hole and flush the edge of the
conductor pipe with the wall surface.
Step 3: Screw the bolts into the conductor pipe. The Wall-mount Managed Switch
is between bolts and conductor pipe, as shown below.
230mm
2 3 0 m m
Ala rm
PW R 2
Rin g
2
4
PW R 1
6
8
R. O.
1
3
5
7
10 00
10 00
LN K/A CT
LN K/A CT
10 /10 0
10 /10 0
10 /10 0
10 /10 0
LN K/A CT
LN K/A CT
Gro und
V+
1
DA +
2
6
DA
7
3
DB +
5
8
4
DB
5
DD +
4
6
DC Inp ut
1
DD
Ra ng e
3
7
2
DC
48 -56 V
8
, 5.8 A ma
DC +
x.
V2
V1
V2
V1
LN K/A CT
Po E-i n-U
DC Inp ut:
se
9V -48 V
, 1.3 A ma
x.
124mm
1 2 4 m m
Po E Us
ag e
24 0W
PW R
18 0W
SY S
12 0W
17
60 W
SF P
18
10 00
LN K
AC T
10 0
LN K
AC T
Po we r
No rm al
Po we r
Fa ilu re
SF P
Po E
9

Advertisement

Table of Contents
loading

Table of Contents