4.
Insert ball bearing (21) into hub (1).
5.
Insert outer races of three roller bearings
(22).
6.
Install hold flange (3) at spindle (2).
7.
Coat locktite #638 at spindle (2) threads.
8.
Place flat washers (37) in the three bolt
holes of the flange (3).
Tightening Torque:
20 kg•m (145 ft lb).
9.
Hammer six parallel pins with an air chisel
until it reaches pin hole bottom.
10. Tighten allen head bolt (19) to specified
torque.
Tightening Torque:
72.3 kg•m (523 ft lb).
S0707330
Page 44
Return to Master Table of Contents
Figure 79
Figure 80
Figure 81
Figure 82
Travel Motor (With Gearbox) (GM35VL)
Need help?
Do you have a question about the Solar 225LC-V and is the answer not in the manual?