Saluki SPS8 Series User Manual page 24

Programmable dc power supply
Table of Contents

Advertisement

Continuous Mode and Step Mode:
When the list operation is under the Step Mode, the power supply will not be changed to next step until
receiving a trigger signal. Please refer to the following diagram:
Automatic Test (>Auto Test)
You can check if the equipment is qualified by editing the automatic test files, such as the value set,
comparison parameters, delay time, inputting the step number (50 steps at most). 4 data of automatic test files
can be edited.
How to edit automatic test files:
1) When the VFD display shows the item Menu Config, press the key ▼ tripple to select the item Auto Test,
followed by pressing the key
2) When the VFD display shows the item Load Atest File,press the key ▼ and choose the item Edit Atest
File, followed by pressing the key
3) When the VFD display shows the item Edit Atest File 1 , press the keys
sequential number that need to be edited, followed by pressing the key
4) When the VFD display shows Atestx Steps= xxx,press the numeric keys to set the total steps of list file,
followed by pressing the key
5) When the VFD display shows Step 1 Test Curr, press the keys
testing types:
Volt means to test the output voltage.
Curr means to test the current.
DVM means to test voltmeter input.
Diagram 4.2 Continious Trigger (2 Times Cyclical)
Diagram 4.3 Step Mode
to confirm.
to confirm.
to confirm.
24
Tel: 886.909 602 109 Email: sales@salukitec.com
and ▼ and select the
to confirm.
and ▼ to select one of the following
www.salukitec.com

Advertisement

Table of Contents
loading

Table of Contents