YASKAWA FP65U T Series Installation & Primary Operation page 34

Table of Contents

Advertisement

7 Electrical Installation
– Length: Less than 180 mm (7.09 in)
1.
Remove the keypad and the Main Switch front cover.
2.
Hold the terminal block bolts with the box wrench and remove the terminal block nuts.
A - Nut and bolt
Note:
The terminal block bolts are not easy to see. Make sure that you put the box wrench on the terminal block bolts correctly.
3.
Put the ends of wires with closed-loop crimp terminals through the knock-out holes on the conduit bracket.
4.
Put the terminal block bolts through the openings in the closed-loop crimp terminals.
34
Figure 7.9 Remove the Terminal Block Nuts
Figure 7.10 Install the Electrical Wires
YASKAWA TOEPC7106171GA FP605 Drive Installation & Primary Operation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fp605

Table of Contents