Unpacking Procedure; Power Requirements - tecan SUNRISE Instructions For Use Manual

Microplate absorbance reader
Hide thumbs Also See for SUNRISE:
Table of Contents

Advertisement

3.3

Unpacking Procedure

3.4

Power Requirements

2021-07
1. Visually inspect the container for damage, before opening it.
Report any damage immediately.
2. Place the carton in an upright position and open it.
The cartridge, filter block and plate transport compartments are fixed with
adhesive tape. The location of the adhesive tape is indicated with a red arrow.
3. Lift the instrument out of the carton and place it on a flat surface, free from
dust, vibration and away from direct sunlight.
4. Visually inspect the instrument for loose, bent or broken parts.
Report any damage immediately.
5. Compare the instrument's serial number, attached on the rear panel of the
instrument, against the serial number of the instrument on the delivery
(shipping) note.
6. Check the instrument spare parts and tools against the delivery (shipping)
note.
7. Open the plate support area cover and remove the foam strip that is used as
the microplate transport lock.
8. Please save all packing materials, as it may be required for storage or later
transportation.
The instrument is auto sensing for the supplied voltage, and therefore does not
have to be set for the correct voltage.
Connect the instrument only to an electricity supply system with protective earth.
TO PREVENT THE RISK OF FIRE, THE MAIN FUSES SHOULD ONLY
BE REPLACED WITH THE SAME TYPE AND RATING OF FUSES.
Instructions for Use for SUNRISE No. 30086638 Rev. No. 2.9
3. Installation Procedure
WARNING
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents