3. Installation Procedure
3.
Installation Procedure
3.1
Introduction
3.2
Unpacking and Inspection
30
This chapter contains the necessary information for installing the instrument.
The installation procedure involves unpacking, environmental requirements,
power requirements and interfacing.
The delivered instrument is shipped in one carton, which includes:
• Power cable
• Computer connection cable
• Instructions for Use for SUNRISE Microplate Absorbance Reader, XFluor4
Instructions for Use
• Spare fuses
• A software CD, which also contains the XFluor4 program and Magellan demo
program (30 day working license).
Foam packaging
Instrument
Instructions for Use for SUNRISE No. 30086638 Rev. No. 2.9
Accessory box
Foam packaging
2021-07