Installation; Checking The Shipment - Keysight Technologies E5061B Installation Manual

Network analyzer
Hide thumbs Also See for E5061B:
Table of Contents

Advertisement

Installation

Checking the Shipment

Checking the Shipment
After you receive the analyzer, carry out checks during unpacking according to
the following procedure.
When unpacking the analyzer, if the exterior of the analyzer (such as the
cover, front/rear panel, LCD screen, power switch, and port connectors)
appear to be damaged during transport, do not turn on the power switch.
Otherwise, you may get an electric shock.
Step 1. Check that the packing box or shock-absorbing material used to package the
analyzer has not been damaged.
If the packing box or shock-absorbing material has been damaged, leave
the packing box and shock-absorbing material as is until other inspection
items are checked as follows.
Step 2. Check the packaged items supplied with the analyzer for any damage or
defects.
Step 3. By referring to the furnished contents list, check that all packaged items
supplied with the analyzer have been received as per the specified options.
Step 4. After checking, if one of the following applies, contact your nearest Keysight
Technologies sales and service office.
1. The packing box or shock-absorbing material used to package the analyzer
2. A packaged item supplied with the analyzer has mechanical damage or
3. A packaged item supplied with the analyzer is missing.
4. A fault has been detected in the subsequent operation check of the
If an abnormality is detected in step 1, contact the company that transported
the analyzer as well as your nearest Keysight Technologies sales and service
office. For inspection by the transport company, save the packing box,
shock-absorbing material, and packaged items as you received them.
16
has been damaged or the shock-absorbing material has traces where
extreme force has been applied.
defects.
analyzer.
Keysight E5061B Network Analyzer

Advertisement

Table of Contents
loading

Table of Contents