Husqvarna 525P4S Workshop Manual page 71

Hide thumbs Also See for 525P4S:
Table of Contents

Advertisement

Connect the 3 springs with the bearing cages.
Make sure that the bearing cages following the
track inside the shaft. On the top of the bearing
cages there is a protruding part that must follow
the track inside the tube.
Make sure they are turned in the right direction so
that the axle control in the ball bearing protrudes
into the telescopic tube.
Note!
Note which direction the axle control (P)
is turned in the ball bearings and the tele-
scopic tube.
The axle control are always pointed
towards sawhead
Assembly clamping sleeve lower
Do not forget then to tighten the screw that fits in
hole (B) and lock the pipes in relation to each other
Tighten the 3 screws on the clamping sleeve.
Mount upper part of tube
Mount upper clamping sleeve (G) on the telescopic
tube (H) and put the telescopic pipe (E) together
with telescopic tube (H).
Tighten the screws (F).
Tighten the locking nut (D)
Note! the stiring gap on the telescopic tube
when assembly the clamping sleeve.
A
A
A
A
Repair instructions
71
English -

Advertisement

Table of Contents
loading

This manual is also suitable for:

525p5s525pt5s

Table of Contents