Figure 6 - Dielectric Strength Testing - RuggedCom RuggedSwitch RS940G Installation Manual

8-port managed gigabit ethernet switch
Hide thumbs Also See for RuggedSwitch RS940G:
Table of Contents

Advertisement

Installation
2.2.3 Dielectric Strength Testing
Units which are to have dielectric strength testing (HIPOT testing) done in the field must have the
braided ground cable disconnected during the test. This is required in order to prevent the surge
suppression circuitry, which is connected to surge ground, from being activated.

Figure 6 - Dielectric Strength Testing

12
RuggedCom
RuggedSwitch
RS940G Installation Guide rev101
®
®

Advertisement

Table of Contents
loading

Table of Contents