Chapter 10 - Troubleshooting and maintenance
13 Reconnect fiber optic cables and
control wires to the phase module.
Be sure to connect the gray fiber
optic connector to the gray socket
and the blue fiber optic connector
to the blue socket.
14 Remove the phase module tray
tool.
15 Reinstall the plexiglass air plenum
with the six socket-head screws. If
an AFE module was replaced, be
sure to reinstall air pressure tube in
plenum. Failure to do so will result
in pressure fault.
16 Switch on all miniature circuit
breakers in the control
compartment.
17 Close the compartment door, follow
lockout-tagout removal
procedures, unground, and start
the drive.
See Chapter 8 - Local operation,
8.5.3 Starting the drive system
locally if you need information on
the start-up procedure.
18 The failed phase module needs to
be returned to ABB after the
replacement is complete. See
Notice for address.
10-32 (32)
NOTICE
If you need further assistance, please contact ABB
Medium Voltage Drives Technical Support at 1-800-
435-7365 Option 4. Please have the serial number of
the ACS2000 unit ready for reference.
Questions can also be emailed to
DriveSupportLine@us.abb.com
NOTICE
Parts sent as warranty replacements need to be
returned to the address listed below within 30 days from
the date of shipment to avoid being charged. Please
place the RMA number on the outside of the box.
ABB Inc.
2500 S. Commerce Dr.
New Berlin, WI 53151
2UEA001270 Rev. F
Replace 6 screws
ACS2000 User manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents