TABLE OF CONTENTS
FOREWORD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2.1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2.2 Power Supply. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2.3 Control Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3- NOMENCLATURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
Error Messages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
5.4 Leakage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
6.2 Fan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22
6.3 Power Supply. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
6.5 LCD Display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26
. . . . . . . . . . . . . . . . . . . . . . 2
Intelect TranSport ® /Vectra Genisys ® Ultrasound Therapy Systems
6.6 Control Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27
6.7 Keymats. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27
8- PARTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33-39
8.1 Top Assembly. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33
9- SCHEMATICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40-44
10- WARRANTY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45
Need help?
Do you have a question about the Intelect TRANSPORT Vectra Genisys 2782 and is the answer not in the manual?
Questions and answers
How do you electrical safety test this
To perform electrical safety testing on the Chattanooga Group Intelect TRANSPORT Vectra Genisys 2782, follow these steps:
1. Power Requirements Check: Ensure the unit operates within the specified input range of 100-240VAC, 75 VA, 50/60 Hz.
2. Leakage Testing: Conduct all necessary leakage tests according to NFPA 99 (National Fire Protection Association) “Health Care Facility” standards.
3. Dielectric Withstand Test: If the unit fails this test or the leakage test, it may indicate serious internal issues. Do not attempt to repair it yourself; send it to the factory for repair.
4. Visual Inspection:
- Check for any visible signs of damage or abuse.
- Ensure the fan is functioning correctly.
5. Unit Startup and Fan Testing:
- The fan should function only when the ultrasound is being emitted.
- If the fan is not blowing outward, check if it is wired incorrectly and rewire or replace it if necessary.
- If the fan is not operating at all, it may be faulty and require replacement.
Following these steps ensures compliance with safety standards and proper functionality of the unit.
This answer is automatically generated