Electrical Connection - WAMGROUP VCP R03 Series Assembly And Main Instructions For Use And Maintenance

Hide thumbs Also See for VCP R03 Series:
Table of Contents

Advertisement

RE-ASSEMBLY
Depending on the type of action carry out the operations described earlier in reverse order by paying special
attention to:
1) Position the diaphragms correctly ensuring that their gaskets adhere to the relative supporting surface.
2) Place the springs and guide washers at the centre of the threaded adjustment rods.
3) Tighten the nuts on the adjustment screws correctly to the end of the thread. The final height between plate
and washer (A, see Figure) must be about 67 ± 4 mm for size 273 and about 104 ± 8 mm for size 375.
4) Fit the cover after placing the rubber washer in the correct position to prevent water seepage.
5) Tighten the cap nuts correctly.

5.7 Electrical connection

The installer must interface the valve and all parts of the plant on which the VCP is to be installed with the nec-
essary commands for start-up/stop, emergency stop, reset after emergency, in compliance with the standards
in force (CEI EN 60204-1, UNI EN 1037, UNI EN 1088, UNI EN 953).
None of the basic utilities require electrical connection.
Fig. 1
VCP
5.0 INSTALLATION AND FIXING
Fig. 1/A
Silo with inclined roof
Fig. 1/B
Silo with flat roof
28
VAL.VCP.--.M.A5.1017.EN
10.17
2
Issue: A5