HP HPE ProLiant DL365 Gen10 Plus Maintenance And Service Manual page 76

Hide thumbs Also See for HPE ProLiant DL365 Gen10 Plus:
Table of Contents

Advertisement

Removing and replacing the HPE
Removing and replacing the
The DC power supply option kits do not ship with a Power Supply DC cable Kit and may not include a Power Supply Cable Lug kit. The
optional DC Cable kit or the optional DC Cable Lug Kit may be purchased directly from Hewlett Packard Enterprise or an authorized
HPE reseller. For additional information, refer to the power supply QuickSpecs at https://www.hpe.com/info/fsps-qs
WARNING:
WARNING:
To reduce the risk of electric shock, fire, and damage to the equipment, you must install this
product in accordance with the following guidelines:
The HPE 800 W Flex Slot -48 VDC hot-plug power supply is intended only for installation in
Hewlett Packard Enterprise servers located in a restricted access location.
The HPE 800 W Flex Slot -48 VDC hot-plug power supply is not intended for direct
connection to the DC supply branch circuit. Only connect this power supply to a power
distribution unit (PDU) that provides an independent overcurrent-protected output for each
DC power supply. Each output overcurrent-protected device in the PDU must be suitable for
interrupting fault current available from the DC power source and must be rated no more
than 30 A.
The PDU output must have a shut-off switch or a circuit breaker to disconnect power for
each power supply. To completely remove power from the power supply, disconnect power
at the PDU. Disconnect the power for each power supply, if there are multiple power
supplies.
In accordance with applicable national requirements for Information Technology Equipment
and Telecommunications Equipment, this power supply only connects to DC power sources
that are classified as SELV or TNV. Generally, these requirements are based on the
International Standard for Information Technology Equipment, IEC 60950-1/IEC 62368-1. In
accordance with local and regional electric codes and regulations, the DC source must have
one pole (Neutral/Return) reliably connected to earth ground.
You must connect the power supply ground screw located on the front of the power supply
to a suitable ground (earth) terminal. In accordance with local and regional electric codes
and regulations, this terminal must be connected to a suitable building ground (earth)
terminal. Do not rely on the rack or cabinet chassis to provide adequate ground (earth)
continuity.
Prerequisites
Prerequisites
Components included with the hardware option kit are available
No. 1 Phillips screwdriver
Optional Q0H80A HPE 800W DC Power Cable Kit can be purchased from an HPE authorized reseller.
If you are not using an input power cord option, the power supply cabling must be made in consultation with a licensed electrician
and be compliant with local code.
If you are replacing the factory installed ground lug, use the KST RNB5-5 crimp terminal ring or equivalent. Use an M5-0.80 x 8
screw to attach the ground lug to the power supply.
Procedure
Procedure
1. Release the cable management arm .
2. If the server is using a single power supply only, remove all power from the server:
a. Back up all server data.
b. Power down the server.
c. Disconnect all peripheral cables from the server.
3. Release the power cords from the strain relief straps.
4. To access the ground cable screw, slide the power supply out of the bay.
HPE 800 W Flex Slot -48 VDC hot-plug power supply
800 W Flex Slot -48 VDC hot-plug power supply
Removing and replacing the HPE 800 W Flex Slot -48 VDC hot-plug power supply
https://www.hpe.com/info/fsps-qs.
76

Advertisement

Table of Contents
loading

Table of Contents