Arrow Laverne 451 Assembly Instructions Manual page 7

Table of Contents

Advertisement

6x35 Cam Bolt x2
c1
8x30 Dowel Pin x10
d1
3.5x16 Screw x6
s1
Lift Rail
Lift Rail
(Left) x1
(Right) x1
TIP: Spray a small amount of
WD-40 or similar lubricant onto a
paper towel and wipe the newly
installed rails. This will make lift
installation and operation easier.
Laverne
Step 1: Cabinet Shell
Attach 2 c1 Cam Bolts and 4 d1 Dowel Pins to Panel Z.
Attach Lift Rail (Right) to Panel Z using s1 Screws.
NOTE: There are two pre-drilled holes for the lift rail: top and bottom. Affix these screws
first, and then add a third screw in the center of the lift rail.
Attach 6 d1 Dowel Pins to Panel Y.
Attach Lift Rail (Left) to Panel Y using s1 Screws.
NOTE: There are two pre-drilled holes for the lift rail: top and bottom. Affix these screws
first, and then add a third screw in the center of the lift rail.
7
Z
Y
Assembly Instructions

Advertisement

Table of Contents
loading

This manual is also suitable for:

Laverne 455

Table of Contents