SolarEdge SE K Series Installation Manual page 43

Three phase inverters with synergy technology
Hide thumbs Also See for SE K Series:
Table of Contents

Advertisement

42
  Connecting Ground and AC Wires to the Synergy Manager
Figure 25: Connecting AC wires to the AC terminals
 8. Place the upper cover of the AC terminal block and push until a lock click is heard.
Close the Synergy Manager cover and secure it by tightening the six screws with a
torque of 3.5 N*m.
Three Phase Inverters with Synergy Technology

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se50kSe66.6kSe55kSe80k

Table of Contents