SolarEdge SE K Series Installation Manual page 40

Three phase inverters with synergy technology
Hide thumbs Also See for SE K Series:
Table of Contents

Advertisement

CAUTION!
When removing the cover, make sure not to damage internal components.
SolarEdge will not be held responsible for any components damaged as a
result of incautious cover removal.
 3. Strip 10 to 11 mm of insulation from the PE wire.
 4. Connect the PE wire to the PE terminal and fasten the Allen screw with a torque of 5
N*m for wires of 16 mm
NOTE
Before connecting lugs to aluminum wires:
 a. Remove oxide from the exposed wires with emery paper or a steel-wire
brush
 b. Clean dust with a cloth and Isopropyl alcohol (IPA)
 c. Coat wires with a designated antioxidant aluminum wire grease
immediately after cleaning
NOTE
Use ferrule when connecting a fine stranded wire of up to 50 mm
Three Phase Inverters with Synergy Technology
Chapter 4: Connecting AC and PV arrays to the Synergy Manager
2
2
to 25 mm
or 8 N*m for wires of 35 mm
Figure 22: Connecting the Protective Earth (PE) wire
    39
2
2
to 70 mm
.
2
.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se50kSe66.6kSe55kSe80k

Table of Contents