SolarEdge SE K Series Installation Manual page 17

Three phase inverters with synergy technology
Hide thumbs Also See for SE K Series:
Table of Contents

Advertisement

16
  Installation Guidelines
P860, P960 and M1600 Power Optimisers
Figure 3: Power Optimisers clearance
When installing PV modules in a confined space such as Building-integrated
photovoltaic (BIPV) modules, ventilation measures may be required to ensure that
the Power Optimisers are not exceeding the maximum temperatures stated in their
specifications.
Three Phase Inverters with Synergy Technology