SolarEdge SE K Series Installation Manual page 32

Three phase inverters with synergy technology
Hide thumbs Also See for SE K Series:
Table of Contents

Advertisement

NOTE
Make sure the mounting surface or structure can support the weight of 82 kg
(for inverter with two Synergy Units) or 114 kg (for inverter with three Synergy
Units) of the inverter and brackets. Make sure that the mounting surface is at
least .
CAUTION!
HEAVY OBJECT. To avoid muscle strain or back injury, use proper lifting
techniques, and if required - a lifting aid.
CAUTION!
SolarEdge inverters and Power Optimisers can be installed at a minimum
distance of 50 m from the shoreline of an ocean or other saline environment, as
long as there are no direct salt water splashes on the inverter or Power
Optimiser.
For SolarEdge inverters installed at a distance of 200 m or closer to the shoreline,
special brackets purchased separately from SolarEdge and SS304 stainless
screws are required.
To mount the inverter:
 1. Determine the inverter mounting location on a wall or stud framing. It is
recommended to mount the inverter in a location protected from direct sunlight.
NOTE
When installing the inverter on a stud framing or a rail, avoid wobbly
installation by adding back support at the lower back side of the Synergy
Manager and Synergy Units (See Figure 15 )
 2. Allow for proper heat dissipation, follow the guidelines specified in
Note - Clearance Guidelines
NOTE
Some Inverter models are provided with only two Synergy Units.
 3. Level the mounting template horizontally against the wall and mark the drilling hole
locations for the bracket of the Synergy Units (see pencil icons in Figure 15 ).
Three Phase Inverters with Synergy Technology
Chapter 3: Installing the Synergy Manager and Synergy Units
.
    31
Application

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se50kSe66.6kSe55kSe80k

Table of Contents