  Step 3: Verifying Proper Activation and Commissioning
When the inverter starts converting power after the initial connection to the AC, the
inverter enters Wake up mode until its working voltage is reached. This mode is
indicated by the flickering green inverter LED.
When working voltage is reached, the inverter enters Production mode and
produces power. The steadily lit green inverter LED indicates this mode.
 4. Tap OK to return to the Commissioning menu.
Communication
Communication settings can be configured only after communication connections are
complete. Refer to Setting Up Communication with the Monitoring Platform on page 50.
Select Monitoring Communication to configure communication with the
monitoring platform.
Select Site Communication to configure communication between multiple
SolarEdge devices or external non-SolarEdge devices, such as batteries or loggers.
Power Control
Power control options are detailed in the Power Control Application Note , available on
the SolarEdge website at:
note_power_control_configuration.pdf.
Step 3: Verifying Proper Activation and
Commissioning
 1. Select Information and verify that the correct firmware versions are installed on each
inverter. To save the information to a read-only file, tap the PDF icon (iOS) or the
JPEG icon (Android) at the bottom of the screen.
 2. Select Status and verify that inverter is operating and producing power.
 3. Verify that additional configurations were properly set by viewing the relevant
Status screens.
 4. Verify that the green inverter LED is steadily lit.
Your SolarEdge power harvesting system is now operational.

Pre-commissioning (Off-Grid)

The following items are required for Pre-commissioning:
Mobile device with SolarEdge SetApp application
Power bank: 60W output port, USB-C Power Delivery (PD): 20V 3A (not provided)
https://www.solaredge.com/sites/default/files/application_
Three Phase Inverters with Synergy Technology

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se50kSe66.6kSe55kSe80k

Table of Contents