The monitoring platform includes a built-in help system that guides you
through the monitoring functionality.
For more information, refer to
monitoring#/.
Creating Logical and Physical Layout using
Installation Information
To display a logical layout, insert in the new site created in the monitoring platform.
When the communication between the and the monitoring server is established, the
logical layout is displayed.
To display a physical layout, you need to map the locations of the installed power
optimisers. To map the locations, use one of the methods described in the next sections.
Designer
Designer recommends inverter and Power Optimiser selection per site size and enables
report generation. You can create a project in Designer and export the site design with
the PV array layout to the monitoring platform.
For more information, refer to
https://www.solaredge.com/products/installer-tools/designer#/.
 
Physical Layout Editor
 1. If you are a registered installer, access the monitoring platform site
creation page at
web/p/home#createSites. If you have not yet signed up, go to
https://monitoring.solaredge.com/solaredge-
web/p/createSelfNewInstaller.
 2. Fill out all required information in the screen, which includes
information about your installation, as well as details about its logical
and physical mapping.
Three Phase Inverters with Synergy Technology
Chapter 5: Activating, Commissioning and Configuring the System
https://www.solaredge.com/products/pv-
https://monitoring.solaredge.com/solaredge-
    49

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se50kSe66.6kSe55kSe80k

Table of Contents