SolarEdge SE K Series Installation Manual page 34

Three phase inverters with synergy technology
Hide thumbs Also See for SE K Series:
Table of Contents

Advertisement

Lift the Synergy Unit from the sides, or hold it at the top and bottom of the unit
to lift into place.
Align the two indentations in the enclosure with the two triangular mounting
tabs of the bracket, and lower the unit until it rests on the bracket evenly (see
Figure 17 ).
For the right or left Synergy Units, insert only one screw through the outer
(exposed) side of the unit and into the bracket. Tighten the screws with a torque
of 4.0 N*m (see Figure 16 ).
NOTE
For the center Synergy Unit, use both side screws.
 8. Hang the Synergy Manager:
 a. Lift the Synergy Manager from its sides.
 b. Align the two indentations in the enclosure with the two triangular mounting
tabs of the bracket, and lower the unit until it rests on the bracket evenly (see
Figure 17 ).
 c. Insert the supplied bracket screw through the right side of the heat sink and
into the bracket.
Three Phase Inverters with Synergy Technology
Chapter 3: Installing the Synergy Manager and Synergy Units
Figure 16: Hanging the Synergy Unit
    33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se50kSe66.6kSe55kSe80k

Table of Contents