The system is now ready to have the power and grounding cables connected.
Power and grounding connections must be made by qualified personnel in
accordance with local electrical codes and the applicable portions of the
National Electrical Code/Canadian Electrical Code. See the stuffer shipped
with in the input box (Fig. 17-4).
(20) Power up the system by moving the circuit breaker located in the input box to
the ON position.
Installing a -48 Vdc Power Distribution System 143
- CAUTION -
Practice 450-1011-201