Net Commissioning - Daikin DCC601A51 Installer's Reference Manual

Intelligent tab controller
Hide thumbs Also See for DCC601A51:
Table of Contents

Advertisement

5
In this window, click A/C Auto Register to display the Auto
Search Result window.
All connected devices will automatically be displayed in the
Search Result List. All search results will have both the type of
unit and their specific port and DIII-NET address.
INFORMATION
If one of the connected units is not displayed in this list,
you can manually add them. To do so, refer to
"10. Advanced
configuration
Controller" on page
17.
6
For
management
points
(Detailed Type = "-"), you can do the following:
a. Select one of the unknown management points.
b. Click Detailed Type.
c. In the Management Point Types window, select the desired
type and confirm.
7
Click Add All if you want to add all management points to the
Register Candidate List.
INFORMATION
If the upper limit of registration is reached, the Add and
Add All buttons will be greyed out.
In this case, you'll need to remove one or more
management points from the list, before you can add new
ones.
8
Click OK to register all devices from the register candidate list.
9
Click OK in the data register to return to the main menu.
INFORMATION
The CPU module will restart.
The commissioning tool will not automatically restart. To
continue, exit the commissioning tool and start it again.
10 If you use the stand-alone mode, your intelligent Tab Controller
app is now set up and ready to use.
11
If you use the cloud-connect mode, continue with the net
commissioning. Refer to
9.8.

Net commissioning

If you chose the cloud-connect mode, you will need to configure and
upload your configuration and settings to the cloud. To do so, you will
do the following:
Activate the net commissioning mode.
Detect all connected (Daikin) equipment.
Configure the connected (Daikin) equipment.
DCC601A51
intelligent Tab Controller
4P420109-1 – 2015.10
of
the
intelligent
whose
type
is
"9.8. Net commissioning" on page
Enter your cloud credentials.
Upload the configuration to the cloud.
INFORMATION
The net commissioning needs to be redone each time you
reconfigure your environment (for example, editing, adding
or removing equipment using the local commissioning
tool).
9.8.1.
Preparations
To connect the intelligent Tab Controller to the cloud, prepare the
following:
Make sure both your computer and the intelligent Tab Controller
are connected to the desired LAN network and the internet.
Make sure the function mode of the intelligent Tab Controller is
set to Cloud-connect Mode.
Make sure all desired (Daikin) equipment is connected to the
intelligent Tab Controller and the power is turned on.
Make sure to set an AirNet address for all indoor units and
outdoor units, and a DIII-NET address for indoor units, using a
connected wired remote controller.
Make sure you have a list with all connected (Daikin) equipment
with the following information:
 Port and DIII-NET address
 Model name
 Serial number
Tab
 Installation place
Make sure you obtained the following cloud credentials:
unknown
 LC No: The registered id number of the intelligent Tab
Controller. This number will be in the following format:
LL1N###### (with # being a numerical value).
 Your cloud User ID
9.8.2.
Activating the commissioning mode ([1] Start
Commissioning)
To activate the net commissioning mode, proceed as follows:
1
Start the commissioning tool and click Net Commissioning
Tool.
2
Enter the password (default: "daikin") and confirm with OK.
The Net Commissioning Tool window will be displayed.
3
Click Start Commissioning to activate the net commissioning
mode. If the button is disabled, the intelligent Tab Controller is
already in commissioning mode, and then this step is not
required.
14.
Installer reference guide
14

Advertisement

Table of Contents
loading

Table of Contents