Sun Fire 15K/12K systems come with various environmental requirements. Review
the site preparation process flow diagram shown in
evaluate the needed requirements before your system installation.
For Sun service personnel, fill out and return
the electronic Installation Report by email,
http://esp.West.Sun.COM/sunfire1
5k_hw_pubs/
02_Install_Report/
Schedule the installation date
based on the anticipated comple-
tion date of site and system arrival.
Complete and review all
worksheets and checklists in
Chapter
5, "Site Planning Checklist."
Plan for equipment arrival
(Section 1.6, "Planning Your
Access Route" on page
FIGURE 1-1
1-13).
Schedule all necessary
modifications and obtain
any necessary hardware.
Site Preparation Process
Obtain system
configuration from
sales engineer.
Determine the type and amount of networking cables
needed. Determine all dynamic system domain
information by reviewing
"System Setup Information" on page
as you begin to
FIGURE 1-1
Determine the amount of cooling
needed by reviewing the system
cabinet power and cooling
requirement
(TABLE
2-2).
Determine the type and amount
of power receptacles needed
(TABLE 3-1
and
Determine the space requirements and
location of the system
FIGURE
1-3,
FIGURE
FIGURE
1-5).
TABLE 4-2 (Section 4.2,
TABLE
3-3).
(TABLE
1-1,
1-4, and
4-2).
1-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fire 12k

Table of Contents