Sun Microsystems Fire 15K Hardware Installation Manual
Sun Microsystems Fire 15K Hardware Installation Manual

Sun Microsystems Fire 15K Hardware Installation Manual

Hide thumbs Also See for Fire 15K:

Advertisement

Quick Links

Sun Fire
15K/12K Systems
Hardware Installation and
De-Installation Guide
Sun Microsystems, Inc.
www.sun.com
Part No. 806-3511-12
June 2003, Revision A
Submit comments about this document at: http://www.sun.com/hwdocs/feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Fire 15K and is the answer not in the manual?

Questions and answers

Summary of Contents for Sun Microsystems Fire 15K

  • Page 1 Sun Fire 15K/12K Systems ™ Hardware Installation and De-Installation Guide Sun Microsystems, Inc. www.sun.com Part No. 806-3511-12 June 2003, Revision A Submit comments about this document at: http://www.sun.com/hwdocs/feedback...
  • Page 2 Copyright 2003 Sun Microsystems, Inc., 4150 Network Circle, Santa Clara, Californie 95054, Etats-Unis. Tous droits réservés. Sun Microsystems, Inc. a les droits de propriété intellectuels relatants à la technologie incorporée dans le produit qui est décrit dans ce document. En particulier, et sans la limitation, ces droits de propriété intellectuels peuvent inclure un ou plus des brevets américains énumérés à...
  • Page 3: Table Of Contents

    Contents Preface xi Preparing for Sun Fire 15K/12K Systems Installation 1–1 Safety Precautions 1–1 Site Preparation 1–4 Connecting the System Controller 1–5 Connecting the Network Hardware 1–5 Installing the Sun Fire 15K/12K Systems Hardware 2–1 Tools Required 2–1 Task List for the Host Installation 2–2 Positioning the System Components 2–3...
  • Page 4 Moving a Sun Fire 15K/12K Systems Cabinet 6–1 Preparing to Move the Cabinet 6–1 Preparing the Cabinet 6–2 Crating the Cabinet 6–3 A. Compliance Statements A–1 Index Index–1 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 5 Figures Sun Fire 15K/12K Systems Grounding 2–4 FIGURE 2-1 System Board Power and ESD Connections 2–5 FIGURE 2-2 Ground Cable Attachment Point at System Cabinet 2–6 FIGURE 2-3 AC Power Cord Installation 2–8 FIGURE 2-4 Cable Label Example 2–8 FIGURE 2-5 Circuit Breakers and Power Supplies 2–9...
  • Page 6 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 7 Tables Safety Precautions 1–2 TABLE 1-1 Symbols 1–2 TABLE 1-2 Task List 2–2 TABLE 2-1 Access Route Clearance 6–3 TABLE 6-1 Tables...
  • Page 8 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 9 Declaration of Conformity Compliance Model Number: 2080 Product Name: Sun Fire 15K/12K Systems European Union This equipment complies with the following requirements of the EMC Directive 89/336/EEC: EN55022:1995/CISPR22:1997 Class A EN55024:1998 EN61000-4-2 4 kV (Direct), 8 kV (Air) EN61000-4-3 3 V/m EN61000-4-4 1.0 kV Power Lines, 0.5 kV Signal Lines...
  • Page 10 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 11: Preface

    Preface The Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide provides the procedures for installing and configuring the host hardware and software. This document is for service personnel and customer data center staff, who are involved in the site preparation for and installation of the Sun Fire™ 15K/12K systems.
  • Page 12 These are called class options. You must be superuser to do this. Command-line variable; To delete a file, type rm filename. replace with a real name or value iv Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 13 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide Service Sun Fire 15K/12K Systems Service Manual Service Sun Fire 15K/12K Systems Service Reference I–Nomenclature Service Sun Fire 15K/12K Systems Service Reference II–Component Numbering Service Sun Fire 15K/12K Systems Carrier Plate Configurations Preface...
  • Page 14 You can submit your comments by going to: http://www.sun.com/hwdocs/feedback Please include the title and part number of your document with your feedback: Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide, part number 806-3511-12 vi Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 15 United States Export Control Laws Notice Products covered by and information contained in this installation and de- installation guide are controlled by U.S. Export Control laws and might be subject to the export or import laws in other countries. Nuclear, missile, chemical biological weapons, or nuclear maritime end uses or end users, whether direct or indirect, are strictly prohibited.
  • Page 16 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 17: Preparing For Sun Fire 15K/12K Systems Installation

    C H A P T E R Preparing for Sun Fire 15K/12K Systems Installation Safety Precautions For your protection, observe the following safety precautions when setting up your equipment: Follow all cautions, warnings, and instructions marked on the equipment. Ensure that the voltage and frequency rating of the power source you use matches the electrical rating label on the equipment.
  • Page 18 Caution Risk of personal injury and equipment damage. To reduce the risk, follow the instructions. A terminal to which alternating current or voltage can be applied. Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 19 Caution – Before you begin, carefully read each of the procedures in this manual. If you have not performed similar operations on comparable equipment, do not attempt to perform these procedures. Chapter 1 Preparing for Sun Fire 15K/12K Systems Installation...
  • Page 20: Site Preparation

    Sun Fire 15K/12K Systems Site Planning Guide. 8. Access to the data center network is available as described in the Sun Fire 15K/12K Systems Site Planning Guide. 9. The system is unpacked and moved to the installation area as stated in the Sun Fire 15K/12K Systems Site Planning Guide and the Sun Fire 15K/12K Systems Unpacking Guide.
  • Page 21: Connecting The System Controller

    The Sun Fire 15K/12K systems have a system controller (System Control board and system control peripheral) that supports administrative control and monitoring of the platform. Two system controllers are included in each of the Sun Fire 15K/12K systems frame. One system controller acts as the primary controller. A second system controller is available to automatically assume administrative control should the primary system controller fail.
  • Page 22 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 23: Installing The Sun Fire 15K/12K Systems Hardware

    C H A P T E R Installing the Sun Fire 15K/12K Systems Hardware Tools Required Note – The following list represents the minimum of tools and test equipment that you need to install the processor cabinet: Screwdriver, common (flat-bladed), 1/8-inch, 3/16-inch Screwdriver, No.
  • Page 24: Task List For The Host Installation

    “Powering On the System” on page 9 components. Configure the preloaded Chapter 3 domain. Finalize the system installation. Chapter 4 De-install the system. Chapter 5 Move the system. Chapter 6 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 25: Positioning The System Components

    Positioning the System Components Caution – Do not make mechanical or electrical modifications to the processor or I/O cabinets. Sun Microsystems is not responsible for the regulatory compliance if the cabinets are modified. 1. If a raised floor is installed, locate the cable cutouts.
  • Page 26: Grounding The Cabinet

    Grounding the Cabinet The Sun Fire 15K/12K systems achieve earth ground through the power cords. For this reason, a gounding cable is not provided with the system. The power cords have three prongs: two for current and one for ground. At the AC input module, the ground prong and system chassis are connected.
  • Page 27: Figure 2-2 System Board Power And Esd Connections

    48V - Frame 1st level engage Board skin Safety ground Diode protected board screws mate with board skin System Board Power and ESD Connections FIGURE 2-2 Chapter 2 Installing the Sun Fire 15K/12K Systems Hardware...
  • Page 28: Figure 2-3 Ground Cable Attachment Point At System Cabinet

    If a difference in ground potential is apparent, you must take corrective action. Use the following procedures to properly ground the Sun Fire 15K/12K systems: 1. Ensure the customer site has properly grounded PDUs in the data center. The PDU must be earth ground.
  • Page 29: Connecting Power Cables

    2. Verify with a digital voltmeter (DVM) that the incoming AC voltage is correct for the customer site. Refer to the Sun Fire 15K/12K Systems Site Planning Guide for further information. 3. Connect the AC power cords into their appropriate AC connectors on the front panel of the power supply.
  • Page 30: Labeling The I/O Cables

    AC Power Cord Installation FIGURE 2-4 Labeling the I/O Cables Once you have verified the site according to the Sun Fire 15K/12K Systems Site Planning Guide, and the system is in place (as detailed in Section 2.3, “Positioning the System Components” on page...
  • Page 31: Powering On The System

    3. Sequentially activate all of the front panel circuit breakers (two circuit breakers per power supply, three power supplies per system, front and rear) on the power supply modules to apply power to the system. Chapter 2 Installing the Sun Fire 15K/12K Systems Hardware...
  • Page 32 2-10 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 33: Configuring The Preloaded Solaris Domain Software

    Domain Software The procedures in this chapter are used to install customer network parameters on the first domain of the Sun Fire 15K/12K systems. These procedures assume that you have opened both an SC command line window and a domain console(1M) window at your terminal display.
  • Page 34 When the first time the domain OS is booted, the administrator is asked to define host specific information. This includes the hostname, locale, and IP address information. See the Solaris installation manuals for this information. Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 35: Completing The Sun Fire 15K/12K Systems Installation

    C H A P T E R Completing the Sun Fire 15K/12K Systems Installation Once the system has been booted and properly configured on the network, run diagnostics. Running SunVTS on the Host The host must first be booted and the local and network variables configured before you run SunVTS™...
  • Page 36 5. Monitor the status of SunVTS. Verify that the system is running and that no test failures are occurring. 6. Repeat Step 2 through Step 5 for each domain to be tested. Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 37: Completing The Installation

    7. Verify the cabinets are positioned according to the site plan. 8. Lower the leveling feet on all four corners of the system cabinet until the leveling feet touch the floor. 9. Adjust the leveling feet down one additional quarter turn. Chapter 4 Completing the Sun Fire 15K/12K Systems Installation...
  • Page 38 Confirm this by visually inspecting the casters to verify that they are in contact with the floor. 11. Following the installation of the Sun Fire 15K/12K systems, complete and return the Installation Report that was shipped with the system cabinet.
  • Page 39: Installing The Sun Fire 15K/12K Systems

    Have the system administrator verify that all domains and the SCs have been properly backed up. Deconfiguring the Domains 1. Deconfigure the domains. Refer to the Sun Fire 15K/12K Systems Management Services (SMS) 1.1 Administrator Guide. 2. Save the SMS configuration files. 3. Deconfigure the SC.
  • Page 40 Note – The following statement appears in the power module, fan backplane, Sun Fireplane interconnect, power centerplane, and cable replacement procedures in the Sun Fire 15K/12K Systems Service Manual: All DC circuit breakers are to remain in the on position at all times.
  • Page 41: Moving A Sun Fire 15K/12K Systems Cabinet

    Systems Cabinet Preparing to Move the Cabinet 1. Because shipping foam compresses in transit, Sun Fire 15K/12K systems cabinets cannot be shipped with a previously used shipping pallet. Obtain a new shipping package that contains a new pallet along with some of the following items:...
  • Page 42: Preparing The Cabinet

    Retracted Leveling Feet FIGURE 6-1 5. Inspect the cabinet for any loose hardware or other debris. 6. Ensure that all interface cables have been removed from the cabinet. Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 43: Crating The Cabinet

    Caution – The kick plate mounting bracket assembly must be removed from the loading side only prior to pushing the cabinet up the 5 degree loading ramps. The cabinet cannot be moved at an angle of more than 10 degrees maximum. Chapter 6 Moving a Sun Fire 15K/12K Systems Cabinet...
  • Page 44: Figure 6-2 Cabinet Kick Plate Assembly Removal

    Align the cabinet wheels at the leading edge of the two ramps ( FIGURE 6-3 Shipping pallet and ramps Cabinet (with doors and kick plates removed) Installed Ramps on Pallet Deck FIGURE 6-3 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 45: Figure 6-4 Cabinet On Shipping Pallet Deck

    Cabinet on Shipping Pallet Deck FIGURE 6-4 g. Use the two remaining tow clamp shipping brackets and four remaining bolts to mount the other end of the cabinet to the shipping pallet. Chapter 6 Moving a Sun Fire 15K/12K Systems Cabinet...
  • Page 46 Install the internal carton top cap over the top of the protective plastic bag and cabinet. e. Attach the service documentation package to the outside of the protective plastic bag. f. Place the coiled power cables in the shipping kit boxes. Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 47: Figure 6-5 Final Packaging And Outside Carton Packaging Assemblies

    Place the carton top cap on top of the cabinet and over the edges of the outer carton wraps. d. Secure with strapping material and fiberboard edge protectors. Ensure the banding material is tight and properly fitted with the edge protectors FIGURE 6-6 Chapter 6 Moving a Sun Fire 15K/12K Systems Cabinet...
  • Page 48: Figure 6-6 Cabinet Ready For Shipping

    (4 each per side) Cabinet Ready for Shipping FIGURE 6-6 e. Apply the TIP-N-TELL device found in the shipping package to the upper half of the carton side. Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 49: Compliance Statements

    A P P E N D I X Compliance Statements...
  • Page 50 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 51 FCC radio frequency emission limits. Networking connections can be made using unshielded twisted-pair (UTP) cables. Modifications: Any modifications made to this device that are not approved by Sun Microsystems, Inc. may void the authority granted to the user by the FCC to operate this equipment.
  • Page 52 BSMI Class A Notice The following statement is applicable to products shipped to Taiwan and marked as Class A on the product compliance label: Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 53 Do not make mechanical or electrical modifications to the Follow all cautions and instructions marked on the equipment. Sun Microsystems is not responsible for equipment. regulatory compliance of a modified Sun product. Ensure that the voltage and frequency of your power source match the voltage and frequency inscribed on the equipment’s electrical rating label.
  • Page 54 Do not connect the power cord when the power supply has been removed from the system chassis. Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 55 Vergewissern Sie sich, daß Spannung und Frequenz Nehmen Sie keine mechanischen oder elektrischen Ihrer Stromquelle mit der Spannung und Frequenz Änderungen an den Geräten vor. Sun Microsystems, übereinstimmen, die auf dem Etikett mit den übernimmt bei einem Sun-Produkt, das geändert wurde, elektrischen Nennwerten des Geräts angegeben sind.
  • Page 56 Schließen Sie den Stecker des Netzkabels an eine in der Nähe befindliche, frei zugängliche, geerdete Netzsteckdose an. Schließen Sie das Netzkabel nicht an, wenn das Netzteil aus der Systemeinheit entfernt wurde. Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 57 Ne pas apporter de modification mécanique ou électrique une des ouvertures de l’appareil. Vous pourriez vous au matériel. Sun Microsystems n’est pas responsable de la trouver en présence de hautes tensions dangereuses. conformité réglementaire d’un produit Sun qui a été...
  • Page 58 Veillez donc à installer le produit à proximité d’une prise murale facilement accessible. Ne connectez pas la prise d’alimentation lorsque le châssis du système n’est plus alimenté. A-10 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 59 No realice modificaciones de tipo mecánico o eléctrico en el No introduzca nunca objetos de ningún tipo a través equipo. Sun Microsystems no se hace responsable del de los orificios del equipo. Pueden haber voltajes cumplimiento de las normativas de seguridad en los peligrosos.
  • Page 60 CD-ROM/DVD-ROM Precaución – El manejo de los controles, los ajustes o la ejecución de procedimientos distintos a los aquí especificados pueden exponer al usuario a radiaciones peligrosas. A-12 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 61 GOST-R Certification Mark Nordic Lithium Battery Cautions Norge ADVARSEL – Litiumbatteri — Eksplosjonsfare.Ved utskifting benyttes kun batteri som anbefalt av apparatfabrikanten. Brukt batteri returneres apparatleverandøren. Sverige VARNING – Explosionsfara vid felaktigt batteribyte. Använd samma batterityp eller en ekvivalent typ som rekommenderas av apparattillverkaren.
  • Page 62 A-14 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...
  • Page 63 Index grounding points, 2-6 air flow floor panels, 2-3 system, 2-4 cabinet I/O cable, 4-3 placement, 2-3 installation unpacking, 1-4 cabinet, 2-3 cable ties, 4-3 completing, 4-3 cabling power cables, 2-7 grounding, 2-7 power, 2-7 signal, 2-8 circuit breakers, 2-9 console connection, 1-5 kick plate assembly, 6-4 crating the cabinet, 6-3...
  • Page 64 2-6 required tools, 6-1 safety precautions, 1-1 signal cabling, 2-8 software, installing packages, 3-1 strapping material, 6-1 system precautions, 1-2 tools required, 2-1 unpacking, 1-4 Index-2 Sun Fire 15K/12K Systems Hardware Installation and De-Installation Guide • June 2003...

This manual is also suitable for:

Fire 12k

Table of Contents