1.4
Facility Power Requirements
❏
Have you determined at what voltage the system cabinet and peripheral
cabinet(s) will be operated?
❏
Have sufficient power receptacles been ordered for each system, monitor, and
peripheral?
❏
Are circuit breakers properly installed and labeled?
❏
Are the power receptacles within 11.5 feet (3.5 meters) of the server cabinet
system, or within 6 feet (1.8 meters) of the standalone server system?
1.5
Physical Specifications
❏
Has the system location been established?
❏
Does the equipment floor layout meet the equipment maintenance access and air
flow requirements?
❏
Is the equipment positioned so that the exhaust air of one device does not enter
the air inlet of another?
1.6
Planning Your Access Route
❏
Has the access route been checked against Table 2-5 for clearances of the
packaged system?
❏
Has a proper pallet jack been checked against Table 2-6 for weight limitation for
moving the system?
❏
Has the elevator been checked against Table 2-5 for clearances and Table 2-6 for
weight restrictions of the packaged system?
1-2
Sun Fire E6900/E4900 Systems Site Planning Guide • May 2006