Download Print this page

OLT SunShed Greenhouse 8x12 Assembly Manual page 31

Plywood roof - t&g model

Advertisement

3/4" Screw
75.
Attach Door Handle and Exterior Black
Drop Latch to door. Handle is positioned on
top door, Drop Latch on bottom door. Attach
Black Drop Latch as illustrated above with 2" &
3/4" Black Screws. Note how female part of
Drop Latch is positioned higher than male. Do
a dry run first to position Drop Latch correctly.
Center (2)
Outside (2)
3 1/2" wide
5 1/2" wide
77.
Locate all Ridge Caps for Polygal Panels (3 Mid / 2 Outside / 2 Center). Starting from the out-
side, position both 5 1/2" wide caps so outside edge is aligned with edge of roof plywood and Cap end
slides under roof. Use a straight edge to aid in alignment. See below. When correctly aligned, attach
Caps to center of outside rafter with 6 - 1 1/2" finishing nails. Ridge Cap has nailing strip attached.
Toll Free 1-888-658-1658
Important: Drill pilot holes with
1/8" drill bit prior to securing
with screws to prevent wood
splitting. On 3/4" screw, drill
shallow pilot hole only.
2" Screws
Ridge Cap slides against Roof Panel and has nailing strip attached to
outside underside of it. Strips allows facia to attach easier in Step 80.
Mid (3)
2 1/2" wide
Plywood
and cap
evenly
aligned.
78.
on mid rafters. Align top to bottom as per Step 77.
www.outdoorlivingtoday.com
76.
Attach Interior Silver Barrel Bolt to inside of
door as illustrated above. Use 3/4" silver screws to
secure. Refer to Step 88 to allow for adequate
clearance.
Cap overhangs rafter
end by approx. 1"
Position and attach Mid Ridge Caps evenly spaced
Page 31
Temporarily positioned Interior
Vertical Door Stop to help
align Interior Barrel Bolt.
Align outside cap
so it is even with
outside of plywood
on roof.
sales@outdoorlivingtoday.com

Advertisement

loading

This manual is also suitable for:

8x12 sunshed greenhouseSunshed greenhouse building 8x12