Download Print this page

OLT SunShed Greenhouse 8x12 Assembly Manual page 15

Plywood roof - t&g model

Advertisement

27.
Position and attach the Door Header (2" x 3 1/8" x 45 1/2") to Door Jamb and Narrow Wall Panel
top framing. Header should sit flush with Door Jamb and Outside of Narrow Wall Panel Siding. Attach
with 3 - 2 1/2" screws.
Confirm 32"
wide Door
Opening at
bottom.
28.
When all walls are attached together, check alignment with
the floor. Bottom wall framing should sit flush with outside of floor
frame. When positioned correctly, fasten bottom wall plates to floor
using 4 - 2 1/2" screws per wall panel.
Important: If walls are not lining up and appear higher or lower
than each other, your floor may not be LEVEL. Please check the
level of your floor. You may need to make slight adjustments to
level your floor before proceeding.
Toll Free 1-888-658-1658
Dado cut on edge
Optional:
Caulking seams will help
prevent moisture from entering. Caulking is
included to complete Polygal Windows
only. Additional Caulking may be required.
www.outdoorlivingtoday.com
Advice: Prior to fastening walls and
installing rafters, take time to confirm your
walls are level, square and plumb.
Measure diagonal at top and bottom of
walls corner-to-corner. This should be
approximately 159 3/4". More importantly, if
measurements are not within 1/4", your
walls are not square. Adjusting now will
make it easier to do the roof section later
Page 15
Angle
screws into perimeter
Floor Joists.
sales@outdoorlivingtoday.com
.

Advertisement

loading

This manual is also suitable for:

8x12 sunshed greenhouseSunshed greenhouse building 8x12