Download Print this page

OLT SunShed Greenhouse 8x12 Assembly Manual page 25

Plywood roof - t&g model

Advertisement

Short Roof Side
54.
Place Roof Panel so it sits flush on 3rd rafter from the outside (doubled up rafter). Plywood on
roof should be flush with end of rafter at bottom. From the outside, screw down through plywood into
rafter with 1 - 2 1/2" screw. Additionally, angle a 2 1/2" screw from outside rafter into roof plywood.
Position Center Roof Panel on both doubled up rafters.
55.
Screw Panel to Rafters through with 6 - 1 1/4" screw. Lift up and place a Long Center Roof
Panel on Rafters (45 1/2" wide). Center Panel evenly on double rafters.
56.
Position Center Plywood Roof Panel so recessed back from the end of the rafters by 1/4" and
attach to rafters as per Step 55.
Toll Free 1-888-658-1658
Outer
Centered
Roof
and 1/4"
Panel 48"
back.
wide.
Slightly past
ridge board.
www.outdoorlivingtoday.com
Page 25
2 3/4" past
rafter
sales@outdoorlivingtoday.com
Center
Panel
45 1/5"
wide.

Advertisement

loading

This manual is also suitable for:

8x12 sunshed greenhouseSunshed greenhouse building 8x12