Download Print this page

OLT SunShed Greenhouse 8x12 Assembly Manual page 17

Plywood roof - t&g model

Advertisement

32.
Next, attach the Side Top Plates (1 1/2" x 2 1/2" x 65 3/4" - 33 3/4 degree cut down edge) to
high wall side. Once again, position top plate so it is flush with inside of wall plate. Side plate should
also be flush with Rear Top Plate. Secure with 4 - 2 1/2" screws per piece. Complete Short Side Top
Plates (3/4" x 2 1/2" x 65 3/4" - 22 1/2 degree cut down edge).
33.
Position remaining Front Top
Plate on wall framing and secure with
4 - 2" screws.
34.
On the high wall side attach Horizontal Wall Extender Braces (3/4" x 3 1/2" x 82 3/4"/48 1/2")
to wall framing to further tie walls together. Position 72 1/2" up from the floor or 1/2" below extender
wall framing. Fasten each piece to wall studs as illustrated above using 8 - 1 1/4" screws.
Toll Free 1-888-658-1658
1/2" below extender
wall framing.
72 1/2"
www.outdoorlivingtoday.com
Page 17
Front Top Plate
sales@outdoorlivingtoday.com

Advertisement

loading

This manual is also suitable for:

8x12 sunshed greenhouseSunshed greenhouse building 8x12