Download Print this page

OLT SunShed Greenhouse 8x12 Assembly Manual page 11

Plywood roof - t&g model

Advertisement

13.
Starting with Solid Wall Panels, carefully lay panel face down. Position and attach Wall Plate
(1 1/2" x 2 1/2" x 45 1/2") to bottom of studs of each wall panel with 3 - 2 1/2" screws. Position so plates
are flush with framing.
14.
Starting at the Rear Left Side, position
a Solid Wall Panel on top of plywood floor.
The Wall Panel bottom framing will sit flush
with floor framing. Wall siding will overhang
the floor.
Important: Make sure all walls are aligned
in their upright position. If not, water may
leak into your shed. Unsure if panel is facing
up or down? check siding on window wall
panel to match alignment, or keep track of
your recently attached bottom plates.
Left Side Wall Panel
15.
The side panels will sit flush with floor
framing in the corners, with the rear panels
sandwiched between them. Note: Siding will
overhang the floor by approx. 5/8".
Toll Free 1-888-658-1658
Important:
Pilot hole ALL 2x3 Wall Studs
with 1/8" drill bit prior to screwing.
This will make it much easier to
attached together.
Bottom Wall Plate
Do Not Attach Walls To
Floor until Step 28.
Outside 2x3
framing of wall
panel is flush
with outside of
floor
framing when
properly
aligned.
www.outdoorlivingtoday.com
34 1/8" wide wall
Optional:
prevent moisture from entering your shed.
Caulking is included to complete Polygal
Windows only. Additional Caulking may be
required.
Page 11
Caulking seams will help
sales@outdoorlivingtoday.com
Pilot
Hole Plate
first.

Advertisement

loading

This manual is also suitable for:

8x12 sunshed greenhouseSunshed greenhouse building 8x12