Download Print this page

OLT SunShed Greenhouse 8x12 Assembly Manual page 24

Plywood roof - t&g model

Advertisement

51.
With Gusset correctly positioned, attach to Rafter with 4 - 2" screws per side. Use a level to
check for square. Pilot hole end of Gussets to prevent splitting. Complete installation of remaining
Gussets.
1/4" gap
52.
Position 3/4" x 3/4" x 44 1/2" long Polygal Support Cleats on each Long Rafter flush to end and
recessed 1/4" down from top of rafter. Pilot hole 1/8" in both ends and attach with 1 1/4" screws. Nail
also to rafter using 4 - 1 1/2" finishing nails. Note: Start nails in Supports on ground first. Complete
remaining 11 Polygal Support Cleats.
D. Roof Section
Center Roof Panel
(2)
53.
Identify all Roof Panels. There are 4 Outside Panels and 2 Center Panels. The outside panels
are (⅝" x 48" x 37 1/2") while the center panels are (⅝" x 45 ½" x 37 1/2"). Starting with an Outside
Roof Panel on Short Rafter Side, lift up and place on rafters so centered on mid rafter. Plywood on
roof should be flush with end of rafter at bottom.
Toll Free 1-888-658-1658
Further secure Cleats
with 2 - 1 1/4" screws.
Important:
Drill pilot
holes to prevent splitting!
www.outdoorlivingtoday.com
Page 24
Outer Roof Panel (4)
Polygal Roof
Panels (6)
sales@outdoorlivingtoday.com

Advertisement

loading

This manual is also suitable for:

8x12 sunshed greenhouseSunshed greenhouse building 8x12