Download Print this page

OLT SunShed Greenhouse 8x12 Assembly Manual page 23

Plywood roof - t&g model

Advertisement

47.
Where Ridge Boards meet, press together and
secure with 12 -1 1/4" screws. In addition, place 4 - 1 1/4"
screws into
any of the remaining Metal Ridge Board
Connectors holes. Complete both sides.
Important: If Gable framing does not line up with Rafters,
remove temporary 2" screws from gable framing (Step 38),
re-align gable and proceed to step 48.
48.
When aligned, secure Gable framing to rafters
with 7 - 2" screws. Further secure to top plate with an
additional 5 - 2" screws (7 in total). Secure other Gable.
Rafter Brackets are bent to 22° and
33°. Use correct bracket for each side.
50.
Attach all Single and Double Rafter Brackets where rafters meet Top Wall Plates inside of
shed. Attach with 2 - 1 1/4" screws and 2 - 2" screws per Single Rafter Bracket and 6 - 2" screws
per Double Rafter Bracket. Position a Roof Gusset on the Center Rafter. Leave a 1" gap from the
top side of the rafter.
Toll Free 1-888-658-1658
49.
make sure walls are aligned correctly. Have
two helpers push on both side walls at the top
from the outside until side top plates are 91"
apart from the inside.
Leave a 1" gap
from top of rafter
www.outdoorlivingtoday.com
Page 23
Offsetting Metal Ridge
Board Connectors.
Prior to securing the Long Rafter Side,
sales@outdoorlivingtoday.com

Advertisement

loading

This manual is also suitable for:

8x12 sunshed greenhouseSunshed greenhouse building 8x12