Download Print this page

OLT SunShed Greenhouse 8x12 Assembly Manual page 14

Plywood roof - t&g model

Advertisement

23.
Position remaining Double Window Walls and attach as per Step 20.
24.
Place 2nd Window Wall
Panel in front and attach as per
Step 16.
26.
Locate Vertical Door Jamb (1 1/2" x 3 1/8 " x 73") and position flush against right wall panel stud.
The Jamb is 3 1/8" wide and will sit flush to outside of wall siding. When positioned correctly,
secure Jamb using 4 - 2 1/2" screws.
Toll Free 1-888-658-1658
25.
Position and attach Narrow Wall Panel to left side wall stud
with 3 - 2 1/2" screws as per Step 22. Note: Narrow Wall is 73"
high.
www.outdoorlivingtoday.com
Page 14
Jamb sits flush with
outside of siding.
sales@outdoorlivingtoday.com

Advertisement

loading

This manual is also suitable for:

8x12 sunshed greenhouseSunshed greenhouse building 8x12