5.1 Forward Planning
We recommend the following steps for installation.
1.
Familiarize yourself with this manual.
2.
Check the minimum install dimensions and vent installation.
3.
Check your local install codes.
4.
Check that you have all the parts and components necessary to complete the installation.
5.
Check that the gas and electrical supplies are ready.
6.
Prepare opening (clean chase, level base, etc.).
7.
Install vent.
8.
Install base unit and connect vent.
9.
Install optional fan.
10.
Connect gas and electrical supplies.
11.
Install operational components and prepare for fi rst test fi re.
12.
Check operation of unit.
13.
Fit surround (optional) and front kit.
14.
Take time to explain the operation of the appliance to the customer.
f i r e - p a r t s . c o m
5.2 Optional Zero Clearance Kit
The 738BV may be installed with the optional zero clearance kit #770ZCK.
See the manual that accompanies the kit for detailed instructions for dimensions and clearances.
DO NOT INSTALL USING COMBUSTIBLE MATERIALS WITHOUT THE USE OF THE 770ZCK
ONLY THE ZERO CLEARANCE KIT #770ZCK, CERTIFIED FOR USE WITH THE MODEL 738, MAY BE
THIS APPLIANCE MUST BE CONNECTED TO A VENTING SYSTEM.
8

Planning

ZERO CLEARANCE KIT.
INSTALLED WITH THIS APPLIANCE.