Planning - Valor 739DVN Installation And Owner's Manual

Direct vent gas insert
Table of Contents

Advertisement

5.1 Forward Planning
We recommend the following steps for installation.
1.
Familiarize yourself with this manual.
2.
Check the minimum install dimensions and vent installation.
3.
Check your local install codes.
4.
Check that you have all the parts and components necessary to complete the installation.
5.
Check that the gas and electrical supplies are ready.
6.
Prepare opening (clean chase, level base, etc.).
7.
Install vent.
8.
Install base unit and connect vent.
9.
Install optional fan.
10.
Connect gas and electrical supplies.
11.
Install operational components and prepare for fi rst test fi re.
12.
Check operation of unit.
13.
Fit surround (optional) and front kit.
14.
Take time to explain the operation of the appliance to the customer (most call backs are caused because
the customer does not understand the operation of the unit).
f i r e - p a r t s . c o m
NOTE: THIS APPLIANCE MAY ONLY BE INSTALLED IN A SOLID-FUEL BURNING FIREPLACE WITH A
WORKING FLUE AND CONSTRUCTED OF NON-COMBUSTIBLE MATERIAL.
8

Planning

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Valor 739dvp

Table of Contents