Download Print this page

Handy Home Products Meridian 8' x 12' Gable 16698 Assembly Manual page 60

Advertisement

• You will finish off the top of the roof with a ridge cap made from shingles.
BEGIN
1
Cut shingles into THREE pieces.
2"
(5,1 cm)
Weather Seal
2
Install first ridge cap flush to shingles at front, as shown.
3
Install second ridge cap 5" back, as shown.
SHINGLES - RIDGE CAP
Hint: Use cut-off pieces first.
2"
(5,1 cm)
2"
(5,1 cm)
(5,1 cm)
Note: • You will need about 33-35 cut pieces.
Flush
5"
(12,7 cm)
FRONT OF
SHED
2"
(5,1 cm)
2"
Top of slot.
(1) Nail per side through weather seal.
(1) Nail per side through weather seal.
Flush
58
2"
(5,1 cm)
Score shingle,
then snap-off angled cut.
33 to 35
Pieces

Advertisement

loading