Download Print this page

Advertisement

Quick Links

DO NOT RETURN TO STORE.
For immediate help with assembly or product information
customerservice@backyardproductsllc.com
Our staff is ready to provide assistance
M-F 8:00 AM to 9:00 PM EST / 6:00 PM PST
Saturday 8:30 AM to 5:00 PM EST / 2:00 PM PST
December through February
M - F 8:00 AM to 8:00 PM EST / 5:00 PM PST
Saturday 8:30 AM to 5:00 PM EST / 2:00 PM PST
STOP!
STOP!
Call Us First!
call our toll free number:
1-888-827-9056
or email:
March through November
16698

Advertisement

loading

Summary of Contents for Handy Home Products Meridian 8' x 12' Gable 16698

  • Page 1 16698 STOP! STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-888-827-9056 or email: customerservice@backyardproductsllc.com Our staff is ready to provide assistance March through November M-F 8:00 AM to 9:00 PM EST / 6:00 PM PST Saturday 8:30 AM to 5:00 PM EST / 2:00 PM PST December through February M - F 8:00 AM to 8:00 PM EST / 5:00 PM PST...
  • Page 2 (This page intentionally left blank.)
  • Page 3 16698 11-05-2020 ASSEMBLY MANUAL 8' x 12' Gable (243,8 x 365,8 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE OPTIONAL: DOOR CENTERED ON EAVE WALL OPTIONAL: Building 12' x 8' DOOR OFFSET (365,8 x 243,8 cm) ON EAVE WALL I M PO RTA NT ! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY. BEFORE YOU BEGIN • BUILDING RESTRICTIONS AND APPROVALS Be sure to check local building department and homeowners association for specific restrictions and/ or requirements before building. • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits.
  • Page 4 TOOLS Required Optional K Phillips K Chalk Line K Tool Belt/ Screwdriver Nail Pouch K Drill / Driver K Utility Knife K Safety Glasses K 3/8" Drill Bit K Shingle Blades K #2 Philips Drive Bit K Hammer K Nail Gun • Gun Nails K Caulk Gun K Pencil K Gloves K Tape Measure K Ladder K Clamps...
  • Page 5 ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • If your shed was purchased with a floor, see floor kit hardware bag for assembly instructions. • See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. REINFORCED WOOD FLOOR FRAME (OPTIONAL) IMPORTANT! Depending on your specific use, you may want to construct a heavy duty floor frame by adding additional floor joists (shown below as shaded). Below is a list of additional materials (not included). 2 x 4 x 8' (5,1 x 10,2 x 243,8 cm) Treated Lumber Cut lumber to 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm) Treated Lumber ea. 3" (7,6 cm) hot-dipped galvanized nails...
  • Page 6 PARTS IDENTIFICATION AND SIZES Part identification is WOOD SIZE CONVERSION CHART stamped on some parts. Nominal Board Size Actual Size 2 x 4 ....1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1 x 4 ....3/4" x 3-1/2" (1,9 x 8,9 cm) 2 x 3 ....1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1 x 3 ....3/4"...
  • Page 7 WALL PANEL & DOOR PARTS LIST NOTE: Panel parts are not stamped with part identification. x1 x2 x2 3/8 x 3-7/8 x 48" (1 x 9,8 x 121,9 cm) x1 x1 x2 x8 LEFT DOOR RIGHT DOOR 3/8 x 23-7/8 x 76" 3/8 x 48 x 76" (1 x 121,9 x 193 cm) (1 x 60,6 x 193 cm) ROOF PANELS NOTE: Roof Panels are 7/16" (1,1 cm) thick 13-7/8 x 96"...
  • Page 8 FASTENER / HARDWARE BAG x 160 1-1/2" (3,8 cm) x 120 2" (5,0 cm) x 65 3" (7,6 cm) x 55 2" (5,0 cm) x 88 1-1/4" (3,2) NOTE: If you are using a nail gun, nails 1" (2.5 cm) may be used where screws are shown for quicker assembly. x 48 3/4" (1,9 cm) Length of nail must match screw length. NAIL BOXES 3" (7,6 cm) BOXES...
  • Page 9 There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS • 3" Screws angled into 4x4. • (2) at each point frame • and 4x4 touch. Measurements to centers of 4x4's. 12" (30,5 cm) MATERIAL REQUIRED 4 x 4 x 12' (10,2 x 10,2 x 365,8 cm) Treated Lumber 12" (30,5 cm) Fasteners for Frame to 4x4. (3" screws shown as one option.) Minimum (40) 3" screws / exterior grade. Use only wood treated for ground contact and fasteners approved for use with treated wood. Always support frame seams. Shingle 4x4 Runner Maximum between leveling...
  • Page 10 CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor. If you choose to install your kit on a concrete slab refer to the diagram below. Treated Sill Plate Caulk between sill plate and concrete. 3-1/2" (8,9 cm) 4" (10,2 cm) Building Size Actual Size 8' x 12' (365,8 x 243,8 cm) 96" x 144" (243,8 x 365,8 cm) 96" (243,8 cm) 137" (348 cm) 144" (365,8 cm) Requires: 2 x 4 x 12' (5,1 x 10,2 x 365,8 cm) MUST be treated lumber. 2 x 4 x 8' (5,1 x 10,2 x 243,8 cm) MUST be treated lumber.
  • Page 11 FLOOR FRAME LEVEL AND SQUARE FLOOR FRAME Before attaching fl oor decking, it is important to level and square the fl oor frame. A level and square fl oor frame is required to correctly construct your shed. BEGIN See page 7 for the preferred fl oor leveling method. Use level and check the frame is level before applying fl oor panels. Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 173-1/16" (439,6 cm). When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners using one fastener at ends of each runner making sure the frame remains square (Fig. A).
  • Page 12 IMPORTANT! Check that the floor frame is level after installing floor panels. Re-level if needed. • The floor should be used as a level work surface for wall construction. • Organize your wall sections during sub-assembly to avoid over-handling of the walls. HINT: Gable Wall Eave Wall Eave Wall Gable Wall Gable Wall Door centered on Eave Wall - Optional - Door offset on Eave Wall - Optional -...
  • Page 13 DOOR HEADER PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 51" (5,1 x 10,2 x 128,9 cm) 7/16 x 3-1/4 x 50-3/4" (1,1 x 8,3 x 170,2 cm) BEGIN Stack TCA and OSB as shown. Nail with 3" nails in the pattern shown. ASSEMBLED END VIEW Flip header assembly over and nail as shown on the other side. Flush Flush FINISH Your door header is now assembled.
  • Page 14 STOP CHOOSE YOUR DOOR LOCATION AT THIS TIME AS YOU WILL ASSEMBLE YOUR DOOR WALL FIRST. STANDARD: DOOR LOCATED ON 8' GABLE WALL 8' GABLE WALL WITH DOOR: IF YOU CHOOSE THE GABLE WALL FOR DOOR LOCATION GO TO Page 13 TO BEGIN BUILDING YOUR WALLS OPTIONAL: DOOR CENTERED ON 12' EAVE WALL 12' EAVE WALL WITH DOOR: IF YOU CHOOSE THE EAVE WALL WITH DOOR CENTERED GO TO Page 15 TO BEGIN BUILDING YOUR WALLS OPTIONAL: DOOR OFFSET ON 12' EAVE WALL 12' EAVE WALL WITH DOOR: IF YOU CHOOSE THE EAVE WALL WITH DOOR OFFSET GO TO Page 17 TO BEGIN BUILDING YOUR WALLS...
  • Page 15 8' WALL WITH DOOR PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) 2 x 4 x 89" (5 x 10,2 x 226,1 cm) Pre Assembled Header BEGIN Orient parts on edge on floor. Measure and mark. HINT: Maintain a 48" (121,9 cm) measurement in door opening (between YFA). For easier nailing stand on frame. Secure with (2) 3" nails at each mark. 89" (226,1 cm) 70 3/4" (179,7 cm) 18 1/4" (46,4 cm) Pre-Assembled Header Install Header in this position 75" (190,5 cm) 1-1/2"...
  • Page 16 8' WALL WITH DOOR PARTS REQUIRED: x54 2" (5,1 cm) 3/8 x 23-7/8 x 76" 3/8 x 3-7/8 x 48" (1 x 60,6 x 193 cm) (1 x 9,8 x 121,9 cm) Install all panels with the primed side facing up. Place (2) 23-7/8" x 76" panels and 3-7/8" x 48" panel on wall frame as shown. Flush all panels to top plate and flush the 23-7/8" x 76"...
  • Page 17 12' WALL WITH DOOR CENTERED PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) Pre Assembled Header 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN Orient parts on edge on floor as shown. Measure and mark. Secure parts with (2) 3" nails at each mark and (4) 3" nails at seams. HINT: For easier nailing stand on frame. 144" (365,8 cm) 132" (335,3 cm) 108" (274,3 cm) 98 1/4" (249,6 cm) 48" 96" (121,9 cm) (243,8 cm) 45 3/4"...
  • Page 18 12' WALL WITH DOOR CENTERED PARTS REQUIRED: 3" (7,6 cm) Temporary Brace x120 69" (75,3 cm) Door Stiffener 2" (5,1 cm) 3/8 x 48 x 76" 3/8 x 3-7/8 x 48" (1 x 121,9 x 193 cm) (1 x 9,8 x 121,9 cm) Install all panels with the primed side facing up. Place (2) 48" x 76" panels and 3-7/8" x 48" panel on wall frame as shown. Flush all panels to top plate and flush the 48" x 76"...
  • Page 19 12' WALL WITH DOOR OFFSET PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) Pre Assembled Header 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN Orient parts on edge on floor as shown. Measure and mark. Secure parts with (2) 3" nails at each mark. HINT: For easier nailing stand on frame. 144" (365,8 cm) 120" (304,8 cm) 96" (243,8 cm) 74-1/4" (188,6 cm)" 48" 96" (121,9 cm) (243,8 cm) 21-3/4"...
  • Page 20 12' WALL WITH DOOR OFFSET PARTS REQUIRED: 3" (7,6 cm) Temporary Brace x125 69" (75,3 cm) Door Stiffener 3/8 x 3-7/8 x 48" 2" (5,1 cm) (1 x 9,8 x 121,9 cm) 3/8 x 48 x 76" 3/8 x 23-7/8 x 76" (1 x 121,9 x 193 cm) (1 x 60,6 x 193 cm) Install all panels with the primed side facing up. Place (2) 23-7/8" x 76"...
  • Page 21 12' WALL - NO DOOR PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) If your door is on the gable wall you will build (2) identical 12' walls. If your door is on the 12' wall you will build (1) 12' wall. BEGIN Orient parts on edge on floor as shown. Measure and mark. HINT: Secure parts with (2) 3" nails at each mark and (4) 3" nails at seams. For easier nailing stand on frame. 144" (365,8 cm) 120" (304,8 cm) 96" (243,8 cm) 72" (182,9 cm) 96" 48" (243,8 cm) (121,9 cm) 24"...
  • Page 22 12' WALL - NO DOOR PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 3/8 x 48 x 76" (1 x 121,9 x 193 cm) Install all panels with the primed side facing up. Ensure your wall frame is square by installing one panel and squaring frame. Place (1) 48" x 76" panel on wall frame as shown. Use the GAA gauge block to mark the 3/4" measurement on the wall stud. Secure panel with (2) 2" nails in the corners (Fig. A). Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud.
  • Page 23 12' WALL - NO DOOR PARTS REQUIRED: 2" (5,1 cm) 3/8 x 48 x 76" (1 x 121,9 x 193 cm) Install (2) 48" x 76" panels fl ush to installed panels and fl ush to top of frame. Secure the panels with 2" nails spaced 6" apart on edges and 12" apart inside panel. Flush Flush 12" 2" (5,1 cm) (30,5 cm) Nails Flush Flush 6" (15,2 cm) Carefully fl ip your eave wall over. Repeat STEPS 1 - 4 to build a second 12' wall if your door is on the 8' gable side. FINISH You have fi nished building your eave wall(s).
  • Page 24 "A" GABLE WALL PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) 2 x 4 x 89" (5,1 x 10,2 x 226,1 cm) 1 "A" IF YOUR DOOR IS ON THE GABLE WALL YOU WILL BUILD GABLE WALL. 1 "A" 1 "B" IF YOUR DOOR IS CENTERED ON THE 12' EAVE WALL YOU WILL BUILD GABLE WALL (P. 24). "A" IF YOUR DOOR IS OFFSET ON THE 12' EAVE WALL YOU WILL BUILD IDENTICAL GABLE WALLS. BEGIN Orient parts on edge on floor as shown. Measure and mark. Secure parts with (2) 3" nails at each mark. 89" (226,1 cm) 68-1/2" (174 cm) 44-1/2" (113 cm) 20-1/2" (52,1 cm) 3" (7,6 cm) Nails 72" (182,9 cm) 1-1/2"...
  • Page 25 "A" GABLE WALL PARTS REQUIRED: 2" (5,1 cm) 3/8 x 48 x 76" 3/4" GAUGE (1 x 121,9 x 193 cm) BLOCK Install all panels with the primed side facing up. Install (2) 48" x 76" panels on frame flush at top. Use the gauge block GAA to maintain a 3/4" measurement on the wall stud. Panels will overlap the frame approximately 3-1/2" (8,9 cm) at each side. Secure panels with 2" nails spaced 6" apart along edges and 12" inside panel. For squareness maintain flush and 2" (5,1 cm) 3/4" measurement along panel edge. Flush Nails Flush BEGIN HERE 3/4" (1,9 cm) 3-1/2" 3-1/2" (8,9 cm) (8,9 cm) 6" (15,2 cm)
  • Page 26 "B" GABLE WALL PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) 2 x 4 x 89" (5,1 x 10,2 x 226,1 cm) BEGIN Orient parts on edge on floor as shown. Measure and mark. Secure parts with (2) 3" nails at each mark. 89" (226,1 cm) 68-1/2" (174 cm) 44-1/2" (113 cm) 20-1/2" (52,1 cm) 3" (7,6 cm) Nails 72" (182,9 cm) 1-1/2" (3,8 cm)
  • Page 27 "B" GABLE WALL PARTS REQUIRED: 2" (5,1 cm) 3/8 x 48 x 76" 3/8 x 23-7/8 x 76" 3/4" GAUGE (1 x 121,9 x 193 cm) BLOCK (1 x 60,6 x 193 cm) Install all panels with the primed side facing up. Place (1) 48" x 76" and (2) 23-7/8" x 76" panels on frame flush at top. Install 48" x 76" panel first. Use the gauge block GAA to maintain 3/4" measurement on the wall stud. Panels will overlap the frame approximately 3-1/2" (8.9 cm) at each side.
  • Page 28 STOP STANDING YOUR WALLS The following steps show how to stand and secure your walls. These instructions are by default with the door on the gable wall. STANDARD: DOOR LOCATED ON 8' GABLE WALL "A" GABLE WALL OPTIONAL: DOOR CENTERED ON 12' EAVE WALL "B"...
  • Page 29 12' WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 69" (175,3 cm) Door Stiffener 3" (7,6 cm) 2" (5,1 cm) BEGIN Center 12' wall on the 144" (365,8 cm) fl oor dimension. 1" (2,5 cm) overlap is to the bottom. Use OO as a temporary brace. Secure with (2) 3" screws. 3" (7,6 cm) Screws 1" (2,5 cm) Secure lower edge of panel to fl oor frame with 2" nails spaced 6" apart. Angle nails into fl oor frame (Fig. A). Secure wall bottom plates to fl oor with 3" nails (Fig. A). 3" (7,6 cm) Nails 6" (15,2 cm) 3" (7,6 cm) Nails Nail 2" nails fi rst.
  • Page 30 GABLE WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 1-1/2" (3,8 cm) 3" (7,6 cm) Fig. B BEGIN Place gable wall centered on fl oor. Secure wall with one 2" screw into 12' wall 2" (5,1 cm) bottom plate (Fig. A) and top plate (Fig. B). Screw Flush Secure wall to bottom plate fi rst. ENSURE PANEL CORNERS ARE FLUSH. 2" (5,1 cm) Screw Fig. A Nail lower edge of panels to fl oor with 2" nails spaced 6" apart.
  • Page 31 12' WALL INSTALLATION PARTS REQUIRED: 2" (5,1 cm) BEGIN Center 12' wall on the 144" (365,8 cm) fl oor dimension. STANDARD: DOOR LOCATED ON GABLE WALL OPTIONAL: DOOR LOCATED ON 12' EAVE WALL Secure wall with (1) 2" screw through gable Fig. B wall panel into 12' wall bottom 2" (5,1 cm) and top plates (Fig. B, Fig. A). Screw Secure wall to bottom plate fi rst. ENSURE PANEL CORNERS ARE FLUSH.
  • Page 32 12' WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) Nail lower edge of 12' wall panels to fl oor frame with 2" nails spaced 6" apart. Angle nails into fl oor frame (Fig. C). 3" (7,6 cm) Secure wall bottom plates to Nails fl oor with 3" nails (Fig. C). 6" (15,2 cm) Nail 2" nails fi rst. 3" (7,6 cm) 2" (5,1 cm) Nails Nails Fig. C 3" (7,6 cm) Screw Fig. D Nail gable wall panel to 12' wall stud with 1-1/2" nails spaced 6" apart.
  • Page 33 GABLE WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) 2" (5,1 cm) Screw REMOVE TEMPORARY BRACING Fig. B BEGIN Place 8' wall on fl oor centered between 12' walls. Secure wall using 2" screws into top and bottom plates (Fig. A, Fig. B). Secure wall to bottom plate fi rst. Flush ENSURE PANEL CORNERS ARE FLUSH. STANDARD: DOOR LOCATED ON GABLE WALL Flush 2" (5,1 cm) OPTIONAL: Screw DOOR LOCATED ON 12' EAVE WALL Fig.
  • Page 34 RAFTERS PARTS REQUIRED: x144 Temporary Support 2" (5,1 cm) 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) 2 x 4 x 55-9/16" (5,1 x 10,2 x 141,1 cm) You will build 7 rafter assemblies. BEGIN Place (2) rafters TZA on top of temporary support AL and flush to inside of 12' eave wall panels. Place gusset on top of rafters with 1/4" (19 mm) offset (Fig. A). Fasten gusset to rafters with (12) 2" nails in pattern shown. For (2) rafters install (1) gusset and set aside. (Fig. B). For (5) rafters, flip over assembled rafter and install a second gusset (Fig. C).
  • Page 35 RAFTER INSTALLATION PARTS REQUIRED: 3" (7,6 cm) Pre-assembled Rafter Pre-assembled Rafter with 2 Gussets with 1 Gusset BEGIN Secure rafters to top plate at measurements shown with (2) 3" screws in rafter ends (Fig. A). Install single-gusset rafters at each end, with gusset facing inward. 24-3/8" 24" 24" 24" 24" 24-3/8" (61,9 cm) (61 cm) (61 cm) (61 cm) (61 cm) (61,9 cm) Flush to Flush to outside outside...
  • Page 36 GABLE UNITS PARTS REQUIRED: 1-1/2" (3,8 cm) 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) Install gable panels with the primed side facing up. BEGIN Orient parts AL on the fl at side, as shown. Place left gable panel as shown. Secure with 1-1/2" nails as shown. 1-3/4" 1-1/2" (3,8 cm) (4,5 cm) Nails AL (on fl at) Flush 1-1/2" (3,8 cm) Place right gable panel fl ush to left panel. Secure with 1-1/2" nails as shown. 1-1/2" (3,8 cm) Nails Flush...
  • Page 37 GABLE UNIT INSTALLATION PARTS REQUIRED: 1-1/2" (3,8 cm) 3" (7,6 cm) x2 Gable Units BEGIN Place gable unit on front wall top plate. It is important to secure the gable unit in the following order: Measure 1-1/2" down from top plate and mark at each side as shown. Set gable unit on top plate. Hold secure with one 2" nail on each side. BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING. Continue nailing lower edge of panels into top plate with 2" nails spaced 6" apart. Working inside, secure gable unit with (2) 3" screws toe-screwed into AL at an angle as shown (Fig. A). 6"...
  • Page 38 DOORS PARTS REQUIRED: 1-1/4" (3,2 cm) 69" Door Stiffener (175,3 cm) 3" (7,6 cm) 3/4" GAUGE BLOCK Left Door Right Door BEGIN Orient parts as shown on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board. Attach temporary support OO using 3" screws. Attach temporary support GAA at bottom using 1-1/4" screws. GREEN 3/8" (1 cm) 3/8" (1 cm) 3/8" (1 cm) OFFSET OFFSET 3" (7,6 cm) Screws (x4) 1-1/4" (3 cm) Screws 3/8" (1 cm) Bottom edges Flush...
  • Page 39 DOORS PARTS REQUIRED: 3" (7,6 cm) 69" (175,3 cm) Door Stiffener BEGIN Install temporary support OO flush under wall panels. Secure OO with (2) 3" screws (Fig. A) . Fig. A Flush against wall panels. Center doors in door opening as shown (Fig. B) . Fasten hinge boards to wall framing and floor with (10) 3" screws as shown. Center in door opening Fig. B 3/8" (1 cm) 3" (7,6 cm) Screws Remove temporary supports and check that the doors open properly.
  • Page 40 DOOR TRIM PARTS REQUIRED: 2" (5,1 cm) 3/4" (1,9 cm) 19/32" x 2-1/2 x 18-5/8" (1,5 x 6,3 x 47,3 cm) 19/32" x 2-1/2 x 32" (1,5 x 6,3 x 81,3 cm) 19/32" x 2-1/2 x 55" (1,5 x 6,3 x 139,7 cm) BEGIN Secure door trim from inside with 3/4" screws as shown (Fig. A). Attach door trim EGB and UWA with 3/4" screws from inside of doors. Reinforce the door trim with 3/4" screws through door panel into trim (Fig. A). Locate screws as shown (Fig. B). Use (2) screws at seams. Center trim ZB over doors and secure with (5) 2" fi nishing nails into framing. 3/4" (1,9 cm) 2" (5,1 cm) CENTER Screws from behind. Finishing Nails Door Panel Fig.
  • Page 41 DOOR STIFFENERS PARTS REQUIRED: 2" (5,1 cm) 69" (175,3 cm) Door Stiffener BEGIN Center OO vertically on the left door in the doorway (Fig. A) overlapping 1" (2,5 cm) along the edge of door (Fig. B). Secure with (7) 2" screws through outside trim into OO. Center OO vertically on the right door in the door opening offset 1" (2,5 cm) from the edge of door (Fig. B). Secure with (7) 2" screws through outside trim into OO. Fig. A Fig. B 1" (2,5 cm) IT IS IMPORTANT TO HOLD Center OO in door THESE...
  • Page 42 DOOR HARDWARE PARTS REQUIRED: 1-1/2" (3,8 cm) 1/4" (0,6 cm) 1/2" (1,3 cm) Drill Bits BEGIN Measure and mark position on right door as shown. Pre-drill 1/4" hole at mark. Finish hole using 1/2" drill bit. Position hardware in hole and secure with screws as shown. INSTALL ON RIGHT DOOR. TOP VIEW 1-3/4" (4,4 cm) 1/4" Pre-drill and 1/2" Drill-through. 1-3/4" 35-3/4" (4,4 cm) (90,8 cm) 1-1/2"...
  • Page 43 DOOR HARDWARE PARTS REQUIRED: 5/16" (0,8 cm) Drill Bit 3/4" (1,9 cm) BEGIN Place bolt on OO in open position with bolt end 3/8" (0,8 cm) down from frame. Bolt is open when loop is contacting base (Fig A). Mark and pre-drill holes for screws. Install bolt with screws supplied. Drill 5/16" (0,8 cm) hole deep enough for bolt to slide into. Place bolt on OO in open position with bolt end 1/2" (1,3 cm) up from floor. Bolt is open when loop is connecting base (Fig. B). Mark and pre-drill holes for screws.
  • Page 44 ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE 48 x 96" BLOCK (121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines). BEGIN Place the 48" x 96" panel on rafters with a 3/4" measurement on the rafter (Fig A) and the panel flush at the peak (Fig. B). Secure panel with (2) 2" nails in the corners. Flush at peak Fig. B Gauge Block Two Nails...
  • Page 45 ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 13-7/8 x 48" (35,2 x 121,9 cm) Install a 13-7/8" x 48" roof panel flush to the Flush at installed panel and flush at peak (Fig. B). peak Secure panel with (2) 2" nails in the corners. Two Nails Fig. B Flush Move the gable until it is at 1/2" (Fig. C) from the 13-7/8" x 48" roof panel. Finish securing panel with (2) 2" nails in the corners. 1/2" (1,2 cm) Fig. C Gable End Rafter Maintain spacing between the center of the rafters at the lower edge of the panels (Fig. D).
  • Page 46 ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 13-7/8 x 96" 47-7/8 x 48" (35,2 x 243,8 cm) (121,6 x 121,9 cm) Install 13-7/8" x 96" and 47-7/8" x 48" roof panels with a 3/4" measurement on the rafter (Fig A) and flush to the installed panels. Secure panel with (1) 2" nail in each corner. 2" (5,1 cm) Nails Flush Flush Flush 3/4" (1,9 cm) 48" Fig. A (121,9 cm) Gauge Block...
  • Page 47 ROOF PANELS PARTS REQUIRED: x108 2" (5,1 cm) Secure all roof panels with 2" nails spaced 6" apart on edges and 12" apart inside panel. 6" (15,2 cm) Repeat STEPS to install roof panels on the opposite side. FINISH Your roof panels are now installed.
  • Page 48 GABLE TRIM PARTS REQUIRED: 2" (5,1 cm) 2 x 4 x 62-3/16" (5,1 x 10,2 x 158 cm) 19/32 x 3-1/2 x 62-3/16" (1,5 x 8,9 x 158 cm) 19/32 x 3-1/2 x 62-3/16" (1,5 x8,9 x 158 cm) BEGIN Place parts HUL and HUR primed side down on top of 2x4 parts NXC. Assemble parts fl ush at corners, as shown. Secure parts with 2" nails spaced evenly. 2" (5,1 cm) Nails Flush Flush Primed Primed side down side down Flush Flush Repeat steps to assemble trim for opposite side. FINISH Your gable trim pieces are now assembled.
  • Page 49 GABLE TRIM PARTS REQUIRED: 2" (5,1 cm) Pre-Assembled Pre-Assembled BEGIN Install assembled gable trim pieces fl ush to roof panels (Fig. A). Secure gable pieces with 2" screws spaced evenly. Flush with roof panels Fig. A Flush at peak Flush Flush 2" (5,1 cm) Screws Repeat steps for opposite side of shed. FINISH Your gable trim is now installed.
  • Page 50 EAVE SOFFIT PARTS REQUIRED: 1-1/4" (3,2 cm) 2 x 6 x 49-1/2" (5,1 x 16,2 x 125,7 cm) 2 x 6 x 96" (5,1 x 15,2 x 243,8 cm) BEGIN Install AS fl ush to VX and fl ush to roof panels (Fig. A). Secure with 1-1/4" screws evenly spaced and following the pattern shown. Flush 1-1/4" (3,2 cm) Screws 9-1/2" (24,1 cm) APPROX. Flush Flush to rafter end Fig. A FINISH Your eave soffi ts are now installed.
  • Page 51 GABLE FASCIA PARTS REQUIRED: 2" (5,1 cm) 19/32 x 2-1/2 x 63-1/16" (1,5 x 6,3 x 160,2 cm) 19/32 x 2-1/2 x 63-1/16" (1,5 x 6,3 x 160,2 cm) BEGIN Install gable trim YOL and YOR fl ush to roof panels (Fig. A). Secure trim with 2" fi nishing nails evenly spaced. Flush at peak Flush Flush 2" (5,1 cm) Finishing Nails Repeat steps for opposite side of shed. FINISH Your gable trim is now installed.
  • Page 52 EAVE FASCIA PARTS REQUIRED: 2" (5,1 cm) 19/32 x 2-1/2 x 62-3/4" (1,5 x 6,3 x 159,4 cm) 19/32 x 2-1/2 x 91" (1,5 x 6,3 x 231,1 cm) BEGIN Install eave trim JUB fl ush to BSA and fl ush to top of roof panels. Fasten trim to 2x6 soffi t with 2" fi nishing nails evenly spaced. Flush Flush Flush 2" (5,1 cm) Finishing Nails Repeat steps for opposite side of shed. FINISH Your eave trim is now installed.
  • Page 53 CORNER TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8 x 1-3/4 x 75-3/4" (1 x 4,4 x 192,4 cm) BEGIN Install gable end 75-3/4" corner trim under gable panel,(Fig. A) and fl ush to eave wall panel (Fig. B). Secure with 2" fi nishing nails spaced evenly. Install eave side 75-3/4" corner trim fl ush to eave soffi t and fl ush along seam of installed corner trim (Fig. C). Secure with 2" fi nishing nails spaced evenly. Fig. B Fig. A Flush to eave panel Flush to 75-3/4"...
  • Page 54 COLLAR TIES PARTS REQUIRED: 2" (5,1 cm) 1 x 4 x 60" (2,5 x 10,2 x 152,4 cm) BEGIN Position and level collar ties JF on 2nd rafters from each gable. HINT: For best appearance install collar tie on rafter facing away from a doorway. Secure collar ties with 2" nails as shown. Flush Flush 2" (5,1 cm) Nails Flush...
  • Page 55 GABLE VENTS PARTS REQUIRED: 1" (2,5 cm) ¸ BEGIN Install (1) vent in each gable. Caulk behind vent fl anges. Secure with 1" screws. FINISH Your gable vents are installed.
  • Page 56 PAINT & CAULK - NOT INCLUDED - PARTS REQUIRED: • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges Building Size Building Paint Trim Paint Caulk Note: Prime all un-primed exterior wood before painting. 12 x 8' 2 Gallons 1 Quart 3 Tubes (365,8 x 244,8 cm)
  • Page 57 SHINGLES - NOT INCLUDED - • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch Notch SHINGLE NAIL PATTERN 1/2" 1" Sealing Strip 1" (1,3 cm) (2,5 cm) (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS. BEGIN Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle. Starter row must be straight and level all the way across with lower edge of roof deck. NOTE: If you have installed drip edge install shingles flush to drip edge.
  • Page 58 SHINGLES continued... Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row. FRONT OF BACK OF SHED SHED Bend in roof 1" (2,5 cm) Notch Flush with rain slots. Flush with rain slots. 1" (2,5 cm) Continue installing rows of shingles by staggering at front. FRONT OF SHED Notch The shingle over the bend in the roof will be nailed down. You will need 3" to 4" of this shingle to extend downward over the bend for nailing. Look for either of the following: • If the rain slot of the shingle installed over the bend is ABOVE the bend and 3" to 4" of it overhangs down over the bend, continue shingling up to the peak.
  • Page 59 SHINGLES continued... After shingles are installed over bend, nail down overlap with two roofi ng nails per tab. (2) Nails per tab. Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak using a utility knife. 5" (12,7 cm) MAX. Cut Off. Top of rain slot. 5" (12,7 cm) or less. • If more than 5" to rain slot you must install another row of shingles. Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge. Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.
  • Page 60 SHINGLES - RIDGE CAP • You will finish off the top of the roof with a ridge cap made from shingles. BEGIN Cut shingles into THREE pieces. Hint: Use cut-off pieces first. 2" 2" (5,1 cm) (5,1 cm) 2" 2" 2" 2" (5,1 cm) (5,1 cm) (5,1 cm) (5,1 cm) Score shingle, then snap-off angled cut. Weather Seal Top of slot. 33 to 35 Note: • You will need about 33-35 cut pieces.
  • Page 61 SHINGLES - RIDGE CAP continued... Continue installing ridge cap to back of roof. Make sure there is 4" (10,2 cm) between the shingle-color and edge of shingles. 4" (10,2 cm) Trim cap off fl ush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot. Install fl ush to shingles. Flush to shingles (2) Nails per side. FINISH You have fi nished your ridge cap.
  • Page 62 16698 Meridian 8' x 12' Gable Order Form BUILDING QTY. l l a l l a & 000000 " " A & " 9 " " B " 8 2 X 4 " 7 " 2 " 1 Gable Overhang *2 X 4 X 62-3/16"...
  • Page 63 LIMITED CONDITIONAL WARRANTY* Backyard Storage Solutions, LLC warrants the following: Every product is warranted from defects in workmanship and manufacturing for 1 year. All accessories, hardware and metal components are warranted for 2 years. All Oriented Strand Board (OSB) is warranted for 2 years Siding and Trim is warranted for 15 years.