Download Print this page

Handy Home Products Meridian 8' x 12' Gable 16698 Assembly Manual page 37

Advertisement

PARTS REQUIRED:
BEGIN
Place gable unit on front wall top plate.
It is important to secure the gable unit in the following order:
Measure 1-1/2" down from top plate and mark at each side as shown. Set gable unit on top plate.
1
Hold secure with one 2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
2
Continue nailing lower edge of panels into top plate with 2" nails spaced 6" apart.
3
Working inside, secure gable unit with (2) 3" screws toe-screwed into AL at an angle as shown (Fig. A).
NAIL FIRST
1-1/2"
2" (5,1 cm)
(3,8 cm )
Measure and
Mark
4
Continue securing panels to rafter with 2" nails spaced 6" apart.
Repeat STEPS 1 - 4 for the opposite side.
FINISH
Your gable units are now installed
GABLE UNIT INSTALLATION
x76
1-1/2" (3,8 cm)
x2 Gable Units
6"
(15,2 cm)
TOP PLATE
x4
AL
Fig. A
35
3" (7,6 cm)
1-1/2"
(3,8 cm )
Measure and
Mark
3" (7,6 cm)
Screws
NAIL FIRST
2" (5,1 cm)

Advertisement

loading