Download Print this page

Handy Home Products Meridian 8' x 12' Gable 16698 Assembly Manual page 11

Advertisement

Before attaching fl oor decking, it is important to level and square the fl oor frame.
A level and square fl oor frame is required to correctly construct your shed.
BEGIN
1
See page 7 for the preferred fl oor leveling method.
2
Use level and check the frame is level before applying fl oor panels.
Check for frame squareness by measuring diagonally across corners. If the
3
measurements are the same, the frame is square. The diagonal measurement
will be approximately 173-1/16" (439,6 cm).
4
When the frame is level and square secure one side of frame to the 4x4 runners
using one fastener at ends of each runner. Move to the opposite end of the frame.
Secure the frame to 4x4 runners using one fastener at ends of each runner making
sure the frame remains square (Fig. A).
First, secure
at ends with
one fastener.
FINISH
Once the fl oor frame is level and square, fasten the frame at each point where the frame contacts the 4x4 runners.
FLOOR FRAME
LEVEL AND SQUARE FLOOR FRAME
173-1/16"
(439,6 cm)
Fig. A
173-1/16"
(439,6 cm)
9
Second, secure
at ends with
one fastener.

Advertisement

loading