Stub-Loose.buffer.tube.(Lbt) - CommScope MINI-OTE 300 Installation Manual

Optical terminal enclosure
Hide thumbs Also See for MINI-OTE 300:
Table of Contents

Advertisement

If cable is shielded and to be grounded proceed to Section 6.
Proceed to Section 7 to assemble cable retention hardware.
5.2.2.9
Snap cable retention assemblies into the appropriate locations.
5.2.2.10
Secure with bolts if grounded. See photos 56-58.
Photo 56
5.2.2.11
Mark point of ribbon containing fibers to be spliced, 51" from sheath opening where signal input comes from.
5.2.2.12
Remove ribbon containing fiber to be spliced from fiber stack.
5.2.2.13
Store express fibers in storage area.
Tray stack may be removed for easier access to storage. See photos 59-61.
Photo 59
Proceed to section 8, Fiber organizing/storage, routing and splicing.
5.2.3
Stub.-.loose.buffer.tube.(LBT)
Butt Stub (Cable End) Configuration
5.2.3.1
Remove 55" of outer sheath from end of cable. See Figure 11.
Photo 57
Photo 60
Figure 11
Photo 58
Photo 61