Working Platform; Outriggers; Transport Position; Hydraulic System - Kesla XS 190 Operation & Maintenance Manual

Self-propelled telescopic platform
Table of Contents

Advertisement

Working platform

-
Fixing equipment
-
Locking of joints
-
Tears and other damage
-
Condition and automatic closing of the gate
-
Access routes and railings

Outriggers

-
Wear
-
Corrosion damage
-
Welded joints

Transport position

-
Rack for boom transport position
-
Positions of outriggers and reliability of the lock valves
-
Condition of brakes

Hydraulic system

-
Leakages
-
Condition of hoses (even a slightly damaged hose or a hose with a slightest leak
must be replaced)

Electric system

-
Condition and fixing of cables
-
Condition of connections
-
Functionality of limit switches

TESTING / TEST LOADING

Operating movements

-
Primarily carry out the test operation or test loading (= overloading) according to the
manufacturer's instructions.
-
If no instructions are available, we recommend that the test operation be carried by
using the maximum permitted loads in extreme and most unfavourable positions. Make a
note of the used load in the journal.
-
Test the functioning of all movements, do not use jerky movements.
-
Observe the "creeping" (sliding) of the outriggers, i.e. the reliability of the lock
valves of the outrigger cylinders when loaded (approx. 1 hour test period).
-
After loading, check carefully for any tears or permanent deformations of the loaded
components.

Controls

-
Check the general condition of controls and their automatic return to the neutral
position.
-
The controls on the working platform must be protected against unintentional faulty
operation.
-
Check the tube railing surrounding the control levers for wear and damages.
Kesla
SELF PROPELLED TELESCOPIC PLATFORM
67
XS
®
190

Advertisement

Table of Contents
loading

Table of Contents