PRONAR T780 Translation Of The Original Instructions page 36

Table of Contents

Advertisement

DRAWING 3.4A LOAD BOX REAR WALL
(1) grain chute, (2) slide gate, (3) rear wall pull-off mechanism
Upper frame is mounted on the lower frame and articulated sockets secured with pins, which
are pivot points when tipping the load box in three directions
Wall ladder (5) and wall extension ladder (6) are mounted to the front wall and wall extension
of the load box – figure (3.3A). Fenced platform (4) is mounted on the right side. Front wall
(7) and rear wall (8) is installed on both sides of the load box – figure (3.4A).
Side walls (extensions) are mounted the using pins in front side wall (extension) brackets and
brackets welded to rear and middle stakes. Slide lock (2) is installed in the rear wall – figure
(3.4A), and chute (1), allowing more accurate unloading of loose materials.
3.7

Advertisement

Table of Contents
loading

Table of Contents