MacDon 3020 Operator's Manual page 78

Pull-type windrower
Table of Contents

Advertisement

MAINTENANCE SCHEDULE
AT FIRST USE: See "Preparing the Windrower" and "Break-In Period" in Operation section.
10 HOURS OR DAILY
1. Grease telescoping driveline.
2. Check hydraulic hoses and lines for leaks.
3. Oil sickle (except in sandy conditions).
4. Check sickle sections, guards and hold-downs.
5. Check tire pressure.
50 HOURS
1. Grease main hitch pivots.
2. Grease wheel casters.
3. Grease reel support bushings.
100 HOURS OR ANNUALLY *
1. Grease drive shaft bearings.
2. Grease drive shaft wooden support bearing - 36 ft. only.
3. Grease countershaft bearings.
4. Grease sickle drive pulley bearings.
5. Grease pitman bearings.
6. Grease draper drive shaft bearings.
7. Grease draper drive shaft wooden support bearings - 36 ft. only.
8. Grease draper drive roller bearings.
9. Grease reel drive pulley hub.
10. Grease split reel connector block - 36 ft. only.
11. Grease wheel hub bearings.
12. Oil telescoping hitch pin.
13. Oil left wheel lock assembly.
14. Check wheel bolt torques.
*It is recommended that Annual Maintenance be done prior to start of operating season.
END OF SEASON: See "Storage Procedure" in Operation section.
Form # 147021
MAINTENANCE/SERVICE
66
Issue 05/05

Advertisement

Table of Contents
loading

Table of Contents